TITLE

CRITICAL PATH METHOD (CPM)

PUB. DATE
January 2001
SOURCE
Encyclopedia of Operations Research & Management Science;2001, p168
SOURCE TYPE
Book
DOC. TYPE
Reference Entry
ABSTRACT
An encyclopedia entry for the term "critical path method" is presented. It refers to a project planning technique that is used for developing strategy and schedules for an undertaking using a single-time estimate for each activity of which the project is comprised. It is concerned with determining the critical path. The term is used in operations research and management science.
ACCESSION #
21891272

 

Related Articles

  • CRITICAL ACTIVITY.  // Encyclopedia of Operations Research & Management Science;2001, p168 

    An encyclopedia entry for the term "critical activity" is presented. It refers to a project work item on the critical pathway having zero float time. The term is used in operations research and management science.

  • CRITICAL PATH.  // Encyclopedia of Operations Research & Management Science;2001, p168 

    An encyclopedia entry for the term "critical path" is presented. It refers to the longest continuous path of activities through a project network from beginning to end. The critical path will have zero float time, if a date for completion has not been specified, so, any delay of activities on...

  • Editorial: Models as Aids to Thought. Rothkopf, Michael H. // Interfaces;Nov-Dec96, Vol. 26 Issue 6, p64 

    Comments on mathematical models in operations research (OR) and the management sciences (MS). Use of the critical path scheduling method, which is popular even outside of OR and MS; Evaluation of a model called decision analysis that aids in thinking; Importance of models in OR and MS that...

  • A NEW APPROACH TO RESTRAINTS OR TARGETS IN CRITICAL-PATH PROJECTS. Law, C. E.; Lach, D. C. // CORS Journal;Jul65, Vol. 3 Issue 2, p72 

    Existing methods of depicting, using, and teaching restraints in critical-path applications are complex and obscure. Most authors ignore the problem altogether; those who do consider restraints use an arrow notation and usually incorporate a least-cost "crashing" algorithm to ensure that the...

  • DECISION ANALYSIS. Schum, David A. // Encyclopedia of Operations Research & Management Science;2001, p194 

    An encyclopedia entry that discusses the application of operations research and management science ideas in decision analysis. Decision analysis identifies a collection of technologies for assisting individuals and organizations in the performance of difficult inferences and decisions. The...

  • GAMING. Schwabe, William // Encyclopedia of Operations Research & Management Science;2001, p321 

    The article presents an encyclopedia entry for gaming. As a method of operations research and management science, gaming is often practiced more as an art than a science. Most games have two or more groups, each representing a decision making entity, with from one to hundreds of players on a...

  • SCHEDULING PROJECT NETWORKS WITH RESOURCE CONSTRAINTS AND TIME WINDOWS. Bartusch, M.; Möhring, R. H.; Radermacher, F. J. // Annals of Operations Research;1988, Vol. 16 Issue 1-4, p201 

    Project networks with time windows are generalizations of the well-known CPM and MPM networks that allow for the introduction of arbitrary minimal and maximal time lags between the starting and completion times of any pair of activities. We consider the problem to schedule such networks subject...

  • CPM.  // Encyclopedia of Operations Research & Management Science;2001, p158 

    An encyclopedia entry for the acronym CPM is presented. It refers to critical path method as applied to operations research.

  • Converting Linear Schedules to Critical Path Method Precedence. Gransberg, Douglas D. // AACE International Transactions;2007, p05 

    The article provides some examples which demonstrated that the two scheduling methods, precedence diagram method and linear scheduling can be used in conjunction with one another to permit the cost engineer to develop the construction project's work sequence in a rational manner that creates bid...

Share

Read the Article

Courtesy of NEW JERSEY STATE LIBRARY

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics