TITLE

The Harmonogram of Karol Adamiecki

AUTHOR(S)
Marsh, Edward R.
PUB. DATE
August 1974
SOURCE
Academy of Management Proceedings (00650668);1974, p32
SOURCE TYPE
Conference Proceeding
DOC. TYPE
Proceeding
ABSTRACT
The Harmonogram, an invention by Karol Adamiecki (1866-1933), an often overlooked pioneer of management who had great influence in Poland and Russia, is presented. The invention is first described in terms of its initial impact. Then its significance to the career of Adamiecki is discussed. Finally, following a brief comparison of the Harmonogram with Gantt Charts and PERT, a translation of a Polish article by Adamiecki describing the Harmonogram is presented. This is the first English language appearance of Adamiecki's article.
ACCESSION #
17530521

 

Related Articles

  • Research Notes. THE HARMONOGRAM OF KAROL ADAMIECKI. Marsh, Edward R. // Academy of Management Journal;Jun75, Vol. 18 Issue 2, p358 

    The article discusses the harmonogram, a form of graphical analysis used by management pioneer Karol Adamiecki in developing a theory of work harmonization in Poland. His harmonograms were various work flow network diagrams, which resulted in graphical solutions to production problems. The work...

  • A GENERALIZED NETWORK APPROACH TO THE PLANNING AND SCHEDULING OF A RESEARCH PROJECT. Eisner, Howard // Operations Research;Jan/Feb62, Vol. 10 Issue 1, p115 

    This paper describes a configurational and mathematical tool that may be used in the planning and scheduling of a research program The configuration, termed a decision box (db) network, is a generalization of the PERT network and allows alternative procedures for accomplishing research tasks to...

  • MATRIX-BASED PROJECT PLANNING METHODS. Kiss, Judit; Koszty´┐Żn, Zsolt Tibor // Problems of Management in the 21st Century;2011, Vol. 1, p67 

    Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2206; Pritsker, 1966), which can be widely applied to project planning from areas as diverse as...

  • Stochastic Audit Planning and Control Using GERT Simulation. Zebda, Awni // Accounting & Business Research (Wolters Kluwer UK);Summer86, Vol. 16 Issue 63, p235 

    Auditing standards require auditors adequately to plan audit engagements and properly to supervise assistants. Technically, Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are limited because they are based on network modeling that may not be capable of representing...

  • PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT).  // Encyclopedia of Operations Research & Management Science;2001, p649 

    The article presents information on program evaluation and review technique. It is a method for planning and scheduling a project which models uncertainties in activity through the use of optimistic, likely and pessimistic time estimates for each activity.

  • PERT and Fuzzy PERT Methods on Project Scheduling under Uncertainty. Petrovan, Adrian; Costea, Cristinel // Carpathian Journal of Electronic & Computer Engineering;2010, Vol. 3 Issue 1, p99 

    Program Evaluation and Review Technique (PERT) is the most widely used network modeling method used to track the planning activities required to complete large-scale projects. This technique has the potential to reduce the time and costs required to complete a project. Unlike classical PERT,...

  • A new probabilistic approach to the path criticality in stochastic PERT. Monhor, Davaadorjin // Central European Journal of Operations Research;Dec2011, Vol. 19 Issue 4, p615 

    The notion of critical path is a key issue in the temporal analysis of project scheduling in deterministic setting. The very essence of the CPM consists in identifying the critical path, i.e., the longest path in a project network, because this path conveys information on how long it should take...

  • Priority Sequencing for Operations Scheduling Decisions in Capacity Constrained Multiple Projects Management in Construction Industries. Ubani, E. C.; Echeme, I. I. // Interdisciplinary Journal of Contemporary Research in Business;Aug2010, Vol. 2 Issue 4, p234 

    Capacity decisions affect the ability of management in construction industries to meet future demand for clients' requirements and competitiveness in effective project delivery. However, managing multiple construction projects with constraints in equipment and machine capacities requires a...

  • Project Management.  // Pharmaceutical Representative;May2010, Vol. 40 Issue 5, p26 

    The article offers information on project management and the models used for project planning and scheduling. It explains the basic elements of project management, such as setting goals and project deadline, identifying and organizing subtasks and setting target dates. A description of the Gantt...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics