TITLE

LETTERS

AUTHOR(S)
Phetteplace, Gary; Damiano, Leonard A.; Bearg, David W.; Mazzoni, Steve; McGraw, Michael; Lentz, Mark S.
PUB. DATE
October 2009
SOURCE
Heating/Piping/Air Conditioning Engineering;Oct2009, Vol. 81 Issue 10, p6
SOURCE TYPE
Periodical
DOC. TYPE
Letter
ABSTRACT
Several letters to the editor are presented in response to articles in the previous issue including "Rethinking Central Utility Plants," by Carl C. Schultz in the August and September 2009 issue, "Multi Parameter Demand-Controlled Ventilation," in the August 2009 issue, and "Regenerative Dual Duct: A Case Study," in the January 2009 issue.
ACCESSION #
44768210

 

Related Articles

  • More on Spreadsheet. London, Alex // ASHRAE Journal;Aug2009, Vol. 51 Issue 8, p12 

    A letter to the editor is presented in response to the article "Equal Friction Solution for Duct Sizing," in the May 2009 issue.

  • Ending the ductwork crisis. Overton, James // Supply House Times;Mar2012, Vol. 55 Issue 1, p4 

    A letter to the editor and a reply are presented in response to the article "Go With the Flow," by Jim Wheeler in the January 2012 issue.

  • Re: Duct Sizing. Phelps, Tom // ASHRAE Journal;Jun2009, Vol. 51 Issue 6, p10 

    A letter to the editor is presented in response to the article "Equal Friction Solution for Duct Sizing," by Fred W. Dougherty in the May 2009 issue.

  • SOUNDING BOARD. Becker, Tom; Dyle, Curtis E.; Allen, William; Dorazio, Bob // Heating/Piping/Air Conditioning Engineering;May2011, Vol. 83 Issue 5, p9 

    Several letters to the editor are presented in response to articles in previous issues including "Investigation Into the Failure of Chilled-Water-Pipe Insulation" in the March 2011 issue and "Predicting the Performance of Flexible-Duct Systems," by William Allen in the December 2010.

  • Innovative ductwork minimises fire risk.  // Heating & Ventilating Review;Jul2010, Vol. 49 Issue 9, p33 

    The article provides information about fire rated ventilation systems and non-coated ducted systems and attenuators which minimise the risk of fires.

  • Proper duct sizing for zoning systems. Reilly, Michael // Air Conditioning Heating & Refrigeration News;08/10/98, Vol. 204 Issue 15, p7 

    Offers advice for heating and ventilation contractors on laying out a duct system for zoning systems in heating and ventilation systems. Impact of zoning on airflow; Ways of dealing with airflow problems in zoning systems; Features of the bypass method to zone a home or business building.

  • City's library uses flat oval, integrated design process.  // Snips;Jan2010 Supplement, Vol. 79, p8 

    The article features the North Vancouver City Library complex in British Columbia which used an integrated design process with natural ventilation and solar energy. The contractor used thick radiant slabs, eccoduct displacement ventilation air-supply duct and spiral flat oval ducts which exposed...

  • Letter From the Editor. Turner, Fred // ASHRAE Journal;Nov2009, Vol. 51 Issue 11, p8 

    A responds by Fred Turner to a letter to the editor about his article "Equal Friction Solution for Duct Sizing" in the May 2009 issue is presented.

  • `El Nino' gable by contractor.  // Air Conditioning Heating & Refrigeration News;08/23/99, Vol. 207 Issue 17, p29 

    Reports on the manufacture of the El Nino Rain Fighter Gable Vent by Beutler Heating & Air Conditioning. Product features; Shape options; Size; Contact information.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics