TITLE

Untitled

PUB. DATE
May 1960
SOURCE
New Yorker;5/14/1960, Vol. 36 Issue 13, p93
SOURCE TYPE
Periodical
DOC. TYPE
Excerpt
ABSTRACT
An excerpt from a narration by Dorsey Offenbach in the San Francisco Examiner of his experiences with the Kodama electric train in Japan is presented.
ACCESSION #
22769866

 

Related Articles

  • Traffic-stopper.  // Classic Trains;Summer2005, Vol. 6 Issue 2, p8 

    A photo essay about a Chicago North Shore & Milwaukee Electroliner train is presented.

  • New Pendolino enters traffic. E. G. H. // Railways Illustrated;Sep2011, Vol. 9 Issue 9, p24 

    The article reports on the regular service entered by the first order of additional Pendolino electric multiple units (EMUs) for the West Coast in Great Britain.

  • BOSTON BARNSTORMER. VANTUONO, WILLIAM C. // Railway Age;Dec2014, Vol. 215 Issue 12, p40 

    The article evaluates the HSP46 diesel-electric locomotives developed by MotivePower Industries.

  • More passenger train service for Fresno and the Valley. Wright, Don A. // Business Journal Serving Fresno & the Central San Joaquin Valley;3/8/2002, Issue 322900, p5 

    Reports on the possibility for the increase in the train service for passengers in the Fresno and other parts of California. Arrival and departure time of the trains according to the facility of passengers; Provision for the bothside departure in the morning and afternoon; Increase in the...

  • Another 'preserved' EMU is disbanded and sold.  // Railways Illustrated;Feb2011, Vol. 9 Issue 2, p13 

    The article reports on another preserved electric multiple unit (EMU), the 4-TC set 417 based at the Doormat Railway, that is set to be disbanded and sold of piecemeal in Great Britain.

  • First 11-car 'Pendo' arrives.  // Railways Illustrated;Feb2011, Vol. 9 Issue 2, p16 

    The article reports on the arrival of the first four of 11-coach Pendolino electric multiple unit (EMUs) in Great Britain and has been taken to Edge Hill Depot in Liverpool, England for its preparation for service.

  • Class 460s soldier on as 442s are late in traffic.  // Railways Illustrated;Feb2011, Vol. 9 Issue 2, p16 

    The article reports on the shortage of Class 460s electric multiple units (EMUs) in Southern service which force retention of eight Class 460s until the Spring because a number of Class 442s have been laid with defects arising from bad weather in England.

  • West London speed-up.  // Modern Railways;Apr2012, Vol. 69 Issue 763, p82 

    The article reports that Class 378 electric multiple units (EMU) are currently allowed to be switched between alternating current (AC) and direct current (DC) without stopping at Mitre Bridge Junction in West London, England.

  • French BB 16500 fade away.  // Railways Illustrated;Sep2010, Vol. 8 Issue 9, p85 

    The article reports on the replacement of remaining 294 25kV AC Class BB165000 regional electric trains by new multiple units in Northern France.

  • New home for 502 EMU at Burscough.  // Railways Illustrated;Mar2012, Vol. 10 Issue 3, p37 

    The article reports that the Class 502 electric multiple unit (EMU) will be accommodated at the Merseyside Transport Trust (MTT) site at Burscough, Lancashire, England.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics