TITLE

BAYONNE BRIDGE PROJECT DELAYED BY SIX MONTHS

PUB. DATE
September 2014
SOURCE
Journal of Commerce (1542-3867);9/29/2014, Vol. 15 Issue 20, p8
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
The article reports that the completion of the raising of the clearance of Bayonne Bridge by 215 feet at the Port of New York and New Jersey is expected to be in 2017.
ACCESSION #
98612807

 

Related Articles

  • Pontis: A System for Maintenance Optimization and Improvement of US Bridge Networks. Golabi, Kamal; Shepard, Richard // Interfaces;Jan/Feb97, Vol. 27 Issue 1, p71 

    This article focuses on the development of Pontis system, an integrated framework for optimizing the maintenance and management of the U.S. network of bridges, and its implementation in California. The system includes the modeling and prediction of maintenance requirements for bridges, the...

  • HIGHWAY HAPPENINGS.  // Overdrive;Feb2001, Vol. 41 Issue 2, p83 

    Focuses on developments related to road projects in the United States, current as of February 2001. Resurfacing on Intersection 84 in Connecticut; Bridge replacement over the New York State Thruway; Road widening along Intersection 15 in Utah.

  • South Carolina DOT Completes Bridge Repair Ahead of Schedule.  // AASHTO Journal: Weekly Transportation Report;1/4/2013, p7 

    The article reports that the South Carolina Department of Transportation (SCDOT) has completed repairs to the U.S. 701 bridge at the Horry-Georgetown county line in December 2012, ahead of schedule by two full weeks. To find a solution to the problem regarding the bridge's foundation, SCDOT...

  • As our roads collapse, we must seek a global solution. D'Amato, Alfonse // Long Island Business News (7/1993 to 5/2009);4/25/2008, Vol. 55 Issue 20, p17A 

    The author reflects on the need to fix the aging infrastructure such as public highways, bridges and tunnels in the U.S. He reveals that the people never see again the level of commitment in infrastructure that the country did after the Great Depression in 1930. He further contends building,...

  • In early June, Vice President Biden. TARRICONE, PAUL // Lighting Design & Application;Aug2010, Vol. 40 Issue 8, p4 

    The author looks at the impact of the economic stimulus legislation American Recovery and Reinvestment Act (ARRA) of 2009 on the U.S. industry, particularly the lighting industry. He says that ARRA is only mentioned in the news when there are stimulus-related events attended by federal...

  • Historic bridge returned to original appearance. Giamario, Ronald; Marks, Michael // Roads & Bridges;Jun98, Vol. 36 Issue 6, p58 

    Details the upgrade made to the Church Street Railroad Bridge in Cumberland, Rhode Island. Original features of the railroad; History of the bridge; Five alternatives presented to the Rhode Island Department of Transportation for the construction of the railroad; Agencies that reviewed the...

  • Is a new Tappan Zee part of 1-87's future? Skriloff, Dylan // Hudson Valley Business Journal;3/12/2007, Vol. 18 Issue 11, p1 

    The article focuses on the two public reviews for the Tappan Zee Bridge upgrading project in Hudson Valley, New York. The public reviews, which attracted about 500 visitor, were focused on presenting to the general public the plans for the upgrading of the bridge which has already become a...

  • Charles Bridge repairs on hold as fears grow about misuse of funds. Ry��nkov�, Irena // Prague Business Journal;6/17/2002, Vol. 7 Issue 24, p6 

    Reports the apprehension on the misuse of funds for the repair of Charles Bridge in Prague, Czech Republic. Amount collected by the Charles Bridge Foundation for bridge repairs; Danger of financial leakage; Resignation of Jan Kasl from the mayoral post.

  • Troubled bridges over water: Maintaining the nation's inventory. Hudson, Kari // American City & County;Feb96, Vol. 111 Issue 2, p30 

    Focuses on the repair needs of bridges in the United States. Reports concerning the controversy on the deterioration of bridges and the measure being done to replace them; Areas with the highest percentage of deficient bridges; Structural areas of concern. INSETS: Engineering report delivers...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics