TITLE

Infrastructure of Baltic Region Transmission System: Analysis of Technical and Economic Factors of its Development

AUTHOR(S)
Obushevs, A.; Oleinikova, I.; Mutule, A.
PUB. DATE
August 2014
SOURCE
Latvian Journal of Physics & Technical Sciences;Aug2014, Vol. 51 Issue 4, p3
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The operational conditions of new networks dictate new requirements for the transmission planning, which would include the electricity market figures and a sizable involvement of renewable generation. This paper focuses on the transmission expansion planning techniques based on the calculations of optimal power flows and on the concept of development planning and sustainability. A description is given for the mathematical model of calculations and analysis of transmission system. The results have shown that the Baltic transmission system infrastructure can successfully be analyzed based on the proposed methodology and developed mathematical model
ACCESSION #
98566147

 

Related Articles

  • Guarding Against Bird Outages. Vosloo, Hein // Transmission & Distribution World;Apr2001, Vol. 53 Issue 4, p70 

    Provides information on the efforts of the company Eskom to eliminate the electric line faults caused by bird streamers in South Africa. Details on the partnership formed by the company with the Endangered Wildfire Trust; Capital and maintenance expenditures for the efforts; Selection of...

  • Hydro One Completes $6.8 million Project to Refurbish Ontario-Michigan Interconnection Transmission Circuit.  // Transmission & Distribution World Exclusive Insight;11/14/2014, p1 

    The article reports on the completion of the refurbishment of 24 towers of an international transmission circuit that links Ontario and Michigan by Ontario Government-owned electricity provider Hydro One. Topics discussed include refurbishment in accordance to Canadian Safety Authority...

  • Linemen Rebuild Aging Infrastructure. Fischbach, Amy // Transmission & Distribution World Exclusive Insight;10/15/2013, p11 

    The article reports that electric utility PPL Electric Utilities Corp. has called its field workforce to upgrade its ageing system. It invested 301 million dollars in system in 2009, 429 million dollars in 2010 and 684 million dollars in 2012 to construct new lines and upgrade the electrical...

  • Taking the underground route. Barth, Patrick // International Power Generation;Sep2003, Vol. 26 Issue 5, p31 

    Examines the relative advantages and disadvantages of overhead versus underground power transmission cables. Environmental aspects; Reliability; Transient faults.

  • 3. Western Europe.  // T&D Report 2004 - World Markets for Transmission & Distribution ;2004, Issue 4, p17 

    Focuses on the electrical power transmission and distribution network structures in Western Europe as of January 2004. Voltage levels of electricity networks in the region; Geographical illustration of Italy's transmission network; Overview of power exchanges between NORDEL countries.

  • Russian Utility Boosts Electricity Distribution Capacity To Vologda Region by 150 Percent with 3M ACCR Line Upgrade.  // Transmission & Distribution World Exclusive Insight;6/8/2012, p5 

    The article reports on the increasing adoption of 3M's new transmission line technology by electric utilities in Russia. The line enables increase in overhead line capacity without requiring larger towers or wider rights of way. The latest utilities that adopted the line are Vologda TPP and...

  • The Optimal Grid: Being Smart Isn't Enough -- Part I. Mauldin, Paul // Transmission & Distribution World Exclusive Insight;5/15/2012, p9 

    The author reflects on the importance of the optimization of the power system as not just making it smarter, such as with smart grids. He stresses the need for an optimal system that provides the best balance of technical performance, customer satisfaction and utility financial success. He...

  • More Power to Las Vegas. Kelly, Jennifer; Keeling, Jay // Transmission & Distribution World;Aug2009, Vol. 61 Issue 8, p22 

    The article focuses on the establishment of the electrical infrastructure of entertainment company MGM Mirage's CityCenter project by electric company NV Energy Inc. in Las Vegas, Nevada. NV Energy was approached by MGM Mirage about the project's electrical infrastructure, in which the 230...

  • MORE TRANSMISSION. Chandramouli, Balaji // Business Today;1/28/2007, Vol. 16 Issue 2, p24 

    The article reports on the plan to develop electric power transmissions in India. It has allocated an investment amounting to Rs 22, 000 crore for the development of 14 projects covering the eastern and north-eastern region of the country. The regions are said to be rich in minerals and shows...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics