Workspace Planning Process Model for Industrialised Building System Projects

AUTHOR(S)
Seman, Mhd. Azmin Mat; Hanafi, Mohd Hanizun; Abdullah, Shardy
PUB. DATE
June 2014
SOURCE
Australian Journal of Basic & Applied Sciences;Jun2014, Vol. 8 Issue 9, p304
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
Background: The method of conventional construction activity planning has not been able to provide space panning requirements at the constructions sites. This is also the case for the existing space planning technique which does not offer full solution in considering the types of the construction method as in the IBS. This planning technique also necessitates highly-skilled users, the use of technology system application techniques and complex mathematical formula causing it to be less practiced in the IBS construction environment and easier and more effective space planning technique. Objective:Therefore, this study has focused on the workspace planning process model development towards the implementation of the IBS construction projects. Results: The proposal for the workspace planning model has been established in the form of short-term documentation. It is constructed through a combination of quantitative and qualitative findings basing them on the brainstorming of various ideas of the planners involved directly at the site. Five stages of the planning process have been arranged by accounting for the aspect of the space-type and methods of solution for the interference and workspace conflicts at the site, in a systematic way, and which is able to help the contractors mitigate these problems at the site. The content of the model constructed is evaluated by nine experts from various fields via face-to-face interviews using a questionnaire form. Conclusion: Positive feedback from all the members of the panel depicts the conclusion that the model content is capable of providing a detailed, comprehensive, all-round, and applicable workspace planning for the actual IBS construction environment.
ACCESSION #
97368431

 

Related Articles

  • "Network Planning, the Continuing Evolution" Sobczak, Thomas V. // Academy of Management Proceedings (0065-0668);1963, p96 

    The article looks at the incremental development of network planning in flow charts in the United States. The impact of Line of Balance (LOB) on production process of raw materials is considered. The use of acronyms as a result of breakthroughs is mentioned. The correlation between LOB and...

  • EXPECTED CRITICAL PATH LENGTHS IN PERT NETWORKS. Fulkerson, D.R. // Operations Research;Nov/Dec62, Vol. 10 Issue 6, p808 

    A method of obtaining a fairly good lower approximation to the expected duration time of a project whose individual job times are diserete random variables is described It is assumed that jobs that immediately precede any given job may have a joint distribution of times, with independence...

  • Custom-tailored PERT/CPM systems. Schonberger, Richard J. // Business Horizons;Dec72, Vol. 15 Issue 6, p64 

    Analyzes the structure of a custom-tailored program evaluation and review technique (PERT) and critical path analysis (CPM) systems. Importance of time criticality on custom-tailored PERT/CPM system design; Levels of CPM; Subsystems of PERT/CPM.

  • Solving the PERT mystery. Reinertsen, Don // Electronic Design;04/19/99, Vol. 47 Issue 8, p64H 

    Presents the flaws of logic contained in a Program Evaluation and Review Technique (PERT) chart, a precedence diagram that depicts the sequence of activities for a project as a time-sequenced network. Argument against the PERT's notion of precedence; Recommendation of the logic of concurrency...

  • PERT/CPM: A Tool for Managing Projects. Wolf, Gary L.; Hauck, Warren C. // Industrial Management;Jan/Feb85, Vol. 27 Issue 1, p22 

    Discusses the use of a network analysis technique called the Program Evaluation and Review Technique and Critical Path Method (PERT/CPM) for project management. Advantages of PERT/CPM; Influence of project size on deciding whether or not PERT/CPM should be used; Ways to overcome resistance to...

  • Critical Path Method. Campbell, Stephanie M. // Appraisal Journal;Oct82, Vol. 50 Issue 4, p607 

    Demonstrates the preparation of an appraisal report using MILESTONE, a software package that uses the Critical Path Method (CPM). Similarities and differences of CPM and Program Evaluation and Review Technique (PERT), two common methods for project planning and evaluation; MILESTONE analysis.

  • The Completion Time of PERT Networks. Robillard, Pierre; Trahan, Michel // Operations Research;Jan/Feb77, Vol. 25 Issue 1, p15 

    PERT and critical path techniques have exceptionally wide applications. These techniques and their applications have contributed significantly to better planning, control, and general organization of many programs. This paper is concerned with a technical improvement in PERT methodology by...

  • Do-It-Yourself CPM/PERT. Barth, Kenneth J. // Industrial Management;Oct65, Vol. 7 Issue 10, p12 

    Discusses the various aspects of the industrial management concepts of Critical Path Method (CPM) and Program Evaluation and Review Technology (PERT). Features and characteristics of CPM and PERT; Use of scratch-pad CPM by shop supervisors; Tips on implementing CPM.

  • ADVANCED NETWORK TECHNIQUES. O'Brien, James J. // SAM Advanced Management Journal (00360805);Fall69, Vol. 34 Issue 4, p77 

    Presents information on advanced techniques for management, such as the critical path method (CPM) and the program evaluation and review technique (PERT). Developers of CPM; Adoption of PERT by the aerospace industry; Information on some network variations.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics