TITLE

A comparison of push and pull production controls under machine breakdown

AUTHOR(S)
Prakash, Joshua; Chin Jeng Feng
PUB. DATE
October 2011
SOURCE
International Journal of Business Science & Applied Management;2011, Vol. 6 Issue 3, p58
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
Production control for high-mix production remains a complex issue. Common pull system replenishment generates large works-in-process (WIPs) for each part type, especially under breakdown. This paper attempts to solve this by presenting a production control that classifies parts into two categories. The performances of three production control mechanisms under breakdown are compared. The production control mechanisms in consideration are push, shared constant WIP (CONWIP), and parallel CONWIP. A full-factorial simulation experiment was conducted. ANOVA was performed to determine the significant effects of input factors. Response surface methodology was used to demonstrate the behavior of performance measures in terms of these significant input factors. The results prove that parallel CONWIP is superior over shared CONWIP in terms of the average flow time per part. If categorical dispatch rules are employed, parallel CONWIP outperforms shared CONWIP in terms of service level. With high card count, parallel CONWIP generally produces lower bottleneck utilizations while maintaining a low average flow time per part than shared CONWIP.
ACCESSION #
97298066

 

Related Articles

  • Nonparametric Disposability Tests. Färe, Rolf; Grosskopf, Shawna; Lovell, C. A. Knox // Journal of Economics;1987, Vol. 47 Issue 1, p77 

    This article develops a set of nonparametric tests of weak and strong disposability of inputs and outputs of production technology. These tests fill an important void in the literature, which heretofore has been concerned primarily with the development of tests of other regularity conditions. A...

  • Expanding the Cobalt Recovery Circuit at the Thompson Nickel Refinery. Jebbink, Peter; Stefan, Rinaldo; Neff, Dave; Tomlinso, Marcus // JOM: The Journal of The Minerals, Metals & Materials Society (TM;Oct2006, Vol. 58 Issue 10, p37 

    The cobalt recovery circuit at the Inco Thompson nickel refinery needed to be expanded to allow the treatment of concentrate from the recently commissioned Voisey's Bay project. Due to higher cobalt grades than historically processed, the capacity of the cobalt circuit needed to be increased...

  • An Eclectic Approach to Estimating U.S. Potential GDP. Gosselin, Marc-André; Lalonde, René // Empirical Economics;Nov2006, Vol. 31 Issue 4, p951 

    Rennison (Comparing alternative output gap estimations: a Monte Carlo approach, 2003) has provided simulation-based evidence showing that the joint use of extended multivariate filters and structural vector autoregression models is optimal for estimating potential output. We use this approach to...

  • Scientific Determination of Performance Standards for Non-Repetitive Activities. Paul, Robert J. // Journal of Retailing;Fall67, Vol. 43 Issue 3, p50 

    The article presents a summary of investigation into methods for the determination of valid, objective, and performance evaluation standards for nonrepetitive service activities. Development of these methods of work measurement will encourage the determination of standards by which performance...

  • What's blocking your employees' productivity? Wetmore, Donald E. // Fort Worth Business Press;11/05/99, Vol. 12 Issue 28, p13 

    Focuses on major blocks to an employee's productivity. Improper selection; Inadequate training; Overworking; Poor alignment of personal and company goals.

  • Don't let non-bottlenecks steal from you! Williams, Hugh // Food Manufacture;Dec2007, Vol. 82 Issue 12, p28 

    The article focuses on the issue regarding the aspect of bottleneck encountered by several business industries in Great Britain. It infers that companies should plan, schedule, and manage constraints carefully to make the most of their limited capacity. It infers that employees will not allow...

  • DRYER STRAITS. Reynolds, David J. // Processing (08968659);Apr2007, Vol. 20 Issue 4, p38 

    The article offers advice on the need to upgrade or replace drying equipment used in production, if bottlenecks at the dryer act as obstacles to increasing production. It is suggested refurbishing, expanding or buying new dryers, depending on the existing equipment, and available space in the...

  • Optimal access regulation with downstream competition. Kao, Tina; Menezes, Flavio M.; Quiggin, John // Journal of Regulatory Economics;Feb2014, Vol. 45 Issue 1, p75 

    We analyze the setting of access prices for a bottleneck facility where the facility owner also competes in the deregulated downstream market. We consider a continuum of market structures from Cournot to Bertrand. These market structures are fully characterized by a single parameter representing...

  • Process Flexibility in Supply Chains. Graves, Stephen C.; Tomlin, Brian T. // Management Science;Jul2003, Vol. 49 Issue 7, p907 

    Process flexibility, whereby a production facility can produce multiple products, is a critical design consideration in multiproduct supply chains facing uncertain demand. The challenge is to determine a cost-effective flexibility configuration that is able to meet the demand with high...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library