TITLE

Central Florida Pipeline project completed

PUB. DATE
February 1997
SOURCE
Underground Construction;Feb97, Vol. 52 Issue 2, p11
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports about the completion of the construction of two pipeline spreads by the Central Florida Pipeline Corporation. Areas covered by the project; Management by the company of the corrosion and buoyancy problems of the project; Management of the contractor Latex Construction Company.
ACCESSION #
9710246737

 

Related Articles

  • CFPL installs products pipeline with directional drilling.  // Pipeline & Gas Journal;Jan96, Vol. 223 Issue 1, p48 

    Reports that Central Florida Pipeline Company has installed a refined petroleum products pipeline using the directional drilling method. Location of the pipeline; Cost of project; Places where directional drilling was used; Installation steps; Information on being prepare for an emergency.

  • Construction Begins on Second Phase of TransColorado Pipeline.  // American Gas;Oct98, Vol. 80 Issue 9, p10 

    Announces that construction has begun on the second phase of the TransColorado pipeline project. Expected date of its completion; What the project can provide.

  • Oman.  // MEED: Middle East Economic Digest;1/7/2000, Vol. 44 Issue 1, p25 

    Reports on the contenders for the Sohar and Salalah gas pipeline contracts in Oman. Aggregate cost of the two pipelines; Finance proposals for the projects.

  • Banks pile in for Oman gas pipeline loans.  // MEED: Middle East Economic Digest;12/3/1999, Vol. 43 Issue 48, p4 

    Reports on the financing plans for the proposed 580 million dollar Sohar and Salalah gas pipeline projects in Oman. Technical bids for the project; Contractors and banking groups.

  • IN BRIEF.  // MEED: Middle East Economic Digest;12/3/1999, Vol. 43 Issue 48, p30 

    Reports on the financing of the Sohar and Salalah gas pipeline projects in Oman.

  • Water pipeline project announced.  // Underground Construction;Jul97, Vol. 52 Issue 7, p6 

    Announces the plans for the construction of water pipeline by Walnut Creek Special Utility District from Lake Bridgesport to Paradise, Cottondale and Wise County, Texas. Areas where the pipeline will provide fresh water; Funding source of the project; Date of acceptance of bids for the project.

  • Gas pipeline project poses multifaceted challenges. Tubb, Maretta // Underground Construction;Dec97, Vol. 52 Issue 12, p22 

    Describes the challenges encountered in the successful installation of a pressure gas pipeline in Sedona, Arizona. Developers of the project; Environmental issues and concerns identified during the public comment period; Horizontal directional drilling.

  • Two states give nod to pipeline.  // ENR: Engineering News-Record;8/19/96, Vol. 237 Issue 8, p13 

    Reports that Montana and Wyoming approved the construction of an 800-mile crude oil pipeline from Canada to Wyoming. Selection of five contractors for American segments; Completion of project by mid-1997.

  • Contract signed for Algerian gas line.  // Pipeline & Gas Journal;Sep93, Vol. 220 Issue 9, p10 

    Reports on the construction of the Algerian portion of the 865-mile Maghreb-Europe gas pipeline. Bechtel's signing of a contract with Sonatrach; Expected awarding of contracts for the Moroccan and Spanish segments by the end of 1993.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics