TITLE

Rapid reaction

AUTHOR(S)
Poulteney, Judith
PUB. DATE
January 1997
SOURCE
People Management;1/23/1997, Vol. 3 Issue 2, p38
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Describes Nuclear Electric PLC's employee training program in Great Britain. Challenge of providing training despite cutbacks and depleted resources faced by manager Paul Rann; Establishment of a network of associate tutors; Priorities identified in the training needs analysis; Tutors' work conditions; Demand for more associate tutors; Split into Nuclear Electric Ltd. and Magnox Electric; Benefits cited. INSET: Business profile..
ACCESSION #
9710064723

 

Related Articles

  • Cracked welds fuel reactor fears. Edwards, Rob // New Scientist;12/10/94, Vol. 144 Issue 1955, p6 

    Reports on the threats posed by the hairline cracks in the welds on steam pipes at one of the Dungeness B advanced gas-cooled reactors in Kent, England. Confidential report from Nuclear Electric; Possibility of a nuclear accident; Government's opinion on the issue.

  • Safety clearance.  // New Scientist;11/9/91, Vol. 132 Issue 1794, p19 

    Announces that Nuclear Electric, a British atomic power generator, has won safety clearance for the first part of its strategy to remove seriously corroded spent fuel from its dry store complex at Wylfa in North Wales. Approval given by the Nuclear Installations Inspectorate for moving...

  • A welcome inheritance.  // Management Today;Nov93, p133 

    Reports that Nuclear Electric PLC will offer its Bankside Power Station in London, England for sale. Options for the station.

  • Sizewell B: Waiting to go.  // New Scientist;6/4/94, Vol. 142 Issue 1928, p7 

    Reports on the completion of the last major test on Sizewell B, Great Britain's first pressurized water nuclear reactor. Operation and development by Nuclear Electric; Government's order on justification of plant's worth.

  • Nuclear Electric profits up.  // Modern Power Systems;Aug93, Vol. 13 Issue 8, p11 

    Reports on the increase in the operating profits of Nuclear Electric in Great Britain in 1993 as compared to that of 1992. Claim that it is on course to meeting its target of breaking even before taking account of the levy in 1995/1996.

  • Sizewell gears up.  // New Scientist;9/24/94, Vol. 143 Issue 1944, p11 

    Reports on Nuclear Electric's expectation that it would finish loading uranium dioxide fuel into the Sizewell B nuclear reactor in Suffolk by the last week of September 1994.

  • Monitoring for energy saving.  // Modern Power Systems;Sep95, Vol. 15 Issue 9, p79 

    Reports on Zeefax Ltd.'s completion of a Process Power Monitoring System for Nuclear Electric's (NE) Hartlepool Power Station. NE's response to the new British government's guidelines on energy saving and efficiency; Design and installation of a PowerLog based energy monitoring scheme.

  • Welsh reactor shuts for good.  // New Scientist;7/24/93, Vol. 139 Issue 1883, p7 

    Reports on Nuclear Electric's permanent closure of its Trawsfynydd plant in North Wales, Great Britain. Discovery that the welds in the pressure vessels have become brittle in February 1991; Order for safety measures on the plant by the Nuclear Installations Inspectorate (NII).

  • Taiwan's dragon boats acquire special dimension for civil engineering. Donkin, Richard // Chinatown News;10/3/94, Vol. 42 Issue 3, p12 

    Discusses the bidding for the Lungmen Island nuclear power plant project at Yenliao, Taiwan. Nuclear Electric, the United Kingdom's state-owned nuclear power company, one of the bidders; Its use of the ancient dragon boats as a symbol; Its sending of a dragon boat team to Taiwan to compete in...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics