TITLE

The test drivers

AUTHOR(S)
Towler, Blake
PUB. DATE
May 1997
SOURCE
Naval Aviation News;May/Jun97, Vol. 79 Issue 4, p30
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Focuses on the test pilots working with the Super Hornet Integrated Test Team. US Navy Lieutenant Frank Morley's enthusiasm about the Super Hornet; Lieutenant Tom Hole's role as weapons separation specialist; Pilots included in the team; Comments about the F/A-18E/F.
ACCESSION #
9708120299

 

Related Articles

  • Flying high with test pilot Billie Flynn. Hurdis, Blake // Esprit de Corps;Apr2012, Vol. 19 Issue 3, p18 

    The article profiles William Flynn, a test pilot at the Canadian Royal Air Force. It is asserted that Flynn is known for having piloted CF-18s almost immediately after graduating from the Royal Military College in Kingston, Ontario. Flynn, a son of a fighter pilot, is married to Canadian...

  • US will discuss codevelopment of updated... Morrocco, J.D. // Aviation Week & Space Technology;12/21/1987, Vol. 127 Issue 25, p20 

    A team of US Defense Department and Navy officials will hold preliminary discussions with allied officials on codevelopment of an upgraded McDonnell Douglas F/A-18. Called the Hornet 2000, the program was recently approved by the Defense Department and includes four configuration options. ...

  • Navy to select Hornet 2000 design by end of.. Morrocco, J.D. // Aviation Week & Space Technology;1/18/88, Vol. 128 Issue 3, p27 

    According to Defense Department officials, the Navy will choose one of four basic design options for a McDonnell-Douglas F/A-18 Hornet 2000 upgrade program by the end of January. Final Navy plans on the Hornet 2000 are due to the Secretary of Defense by the first week of March. It will be...

  • Allison considers development of new high-performance engine.  // Aviation Week & Space Technology;7/17/1989, Vol. 131 Issue 3, p78 

    Talks about plans by General Motors Corp.'s Allison Gas Turbine Div. to get back into the high-performance military engine business in time for the prospective Hornet 2000, the successor to the McDonnell Douglas F/A-18 strike fighter. Allison's strategic plan.

  • Korea picks F/A-18 for coproduction, cites capabilities, industry benefits. Bond, D.F. // Aviation Week & Space Technology;1/1/1990, Vol. 132 Issue 1, p34 

    Reports that South Korea has chosen the McDonnell Douglas F/A-18 strike fighter over the General Dynamics F-16 for its FX fighter program, because the F/A-18's capabilities and Douglas' economic package outweigh the F-16's lower cost.

  • Military affairs update. Macrae, Duncan // Interavia Business & Technology;Apr95, Vol. 50 Issue 589, p39 

    Presents a photograph of a full-scale aluminum model of the McDonnell Douglas F-18E/F fighter aircraft. Design features.

  • Navy seeks 228 more F/A-18C/Ds, rewinging of additional A-6Es.  // Aviation Week & Space Technology;3/25/1991, Vol. 134 Issue 12, p24 

    Examines the Navy's new Pentagon request for 228 additional F/A-18 C/Ds and the rewinging of 60 A-6E attack aircraft. The increased procurement plan comes as an attempt to pick up the slack left by the cancellation of the A-12 program. Operational requirements; Long-term affordability;...

  • McDonnell F/A-18E/F offers increased range, endurance. Morrocco, J.D. // Aviation Week & Space Technology;3/25/1991, Vol. 134 Issue 12, p25 

    Examines design concepts developed by McDonnell Douglas for the proposed F/A-18E/F attack aircraft. The concepts will increase the aircraft's attack range and loiter time by nearly forty percent. Improved mission radius; Major upgrade features;Touch sensitive display screen; More advanced systems.

  • Dryden completes first flights of F/A-18 HARV with thrust vectoring. Henderson, B.W. // Aviation Week & Space Technology;7/29/1991, Vol. 135 Issue 4, p25 

    Describes the first test flights of NASA's F/A-18 High Angle of Attack Research Vehicle (HARV), part of a multi-year study which includes flight tests, extensive wind tunnel research and computational fluid dynamics work. NASA centers involved inthe project; Thrust-vectoring system; Contractors...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics