TITLE

Ontario IMO to Fire up Modern SCADA/EMS

PUB. DATE
March 2003
SOURCE
Utility Automation;Mar/Apr2003, Vol. 8 Issue 2, p8
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Reports on the Ontario Independent Electricity Market Operator's plans to decommission its SCADA/EMS technology following installation of ABB's system security application. System features and functions; Installation plans.
ACCESSION #
9592246

 

Related Articles

  • Selective extension for PPAs.  // Malay Mail;5/25/2012, p21 

    The article reports that only 50% of the existing power purchase agreements (PPAs) with independent power producers (IPPs) will be extended after expiration in 2015/2016 to boost the competitive rate for the power industry, according to Malaysia's Tenaga Nasional Bhd (TNB).

  • Biomass 'first' for Scotland. Ashmore, Colin // European Power News;Apr2002, Vol. 27 Issue 4, p22 

    Reports on the introduction of a biomass-fuelled power plant in Scotland. Capacity of the biomass plant; Total power demand of the country; Increase in the number of independent power producers.

  • Merchant power market slump could be snapped by blackout. Stinson, Sonya // New Orleans CityBusiness (1994 to 2008);9/29/2003, Vol. 24 Issue 14, p28 

    Reports on the energy capacity of the merchant power plants in Louisiana. Provision of job opportunities; Increase of the competitive market for electric power producers; Assessment of the energy-related financial problems. INSET: The merchant power debate.

  • TIPRO'S 64TH ANNUAL CONVENTION AGENDA.  // TIPRO Target Newsletter;2/19/2010, Vol. 13 Issue 4, p4 

    The article presents the agenda of the 64th Annual Convention of the Texas Independent Producers and Royalty Owners (TIPRO) Association on February 24 and 25, 2010.

  • China Powers Up. Zhu, Songbin; Li, Xiaolin // China Business Review;May/Jun2003, Vol. 30 Issue 3, p18 

    Reports on the status of power or energy supply in China as of May 1, 2003. Impact of power shortages on the country's industrial sector; National independent power producers in the country; Companies that were transferred to the national independent power producers. INSETS: Power in the 10th...

  • IPPs Up Ownership to 186,000 MW. Chambers, Ann // Power Engineering;Oct98, Vol. 102 Issue 10, p8 

    Reports on the increase of the worldwide power plant holdings of independent power products. Ranking of power markets around the world; Statistical data on the capacity of several utilities.

  • Twenty-eight Hydel Projects ask Government to Declare them Sick.  // Hydro Nepal: Journal of Water, Energy & Environment;Jan2012, Issue 10, p92 

    The article reports on the demand of the independent power producers (IPPs) to seek relief measures from the government saying that they cannot move with the hydropower projects due to high bank interest rates in Nepal.

  • Malaysia set to strike new deal with IPPs.  // Power Economics;Jun2001, Vol. 5 Issue 6, p10 

    Reports the renegotiations of Tenaga Nasional BhD with independent power producer (IPP) projects on tariff agreements in Malaysia. Reduction of IPP output; Development of 4200 mega watt power capacity; Significance of the currency rate recovery due to Asian currency crisis.

  • Riyadh invites firms to bid on Rabigh private power project. RATCLIFFE, VERITY // MEED: Middle East Economic Digest;5/25/2012, Vol. 56 Issue 21, p16 

    The article discusses a request by the Saudi Electricity Company (SEC) for bids to build an independent power project (IPP) at Rabigh, Saudi Arabia.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics