TITLE

New tensioning equipment saves critical path time in nuclear outage

PUB. DATE
October 1995
SOURCE
Power Engineering;Oct95, Vol. 99 Issue 10, p54
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Features the tensioning equipment used at Tennessee Valley Authority's (TVA) Browns Nuclear Plant in Texas. Power-plants operated by TVA; Impact of the tensioning equipment to radiation exposure and critical path time; TVA's agreement with Biach Industries; Problems during the detensioning process.
ACCESSION #
9511062445

 

Related Articles

  • Nuclear power.  // Power;Dec93, Vol. 137 Issue 12, p15 

    Presents equipment, services and techniques for improving nuclear power plants. Includes a laser welding method from Westinghouse Electric Corp.; Casks for storing spent fuel from EPRI; Backwashing aids for boiling-water reactors from Pall Corp.

  • A Seismic Switch: Certified Switchgear for Nuclear Power Plants is providing a critical link in the chain.  // Transmission & Distribution World Exclusive Insight;3/12/2012, p1 

    The article deals with a certified switchgear for nuclear power plants.

  • Buzzer will save fish and permit.  // ENR: Engineering News-Record;05/26/97, Vol. 238 Issue 21, p38 

    Features a new acoustic fish deterrence system which provides a nuclear power plant with low-cost, environmentally-sensitive means to maintain its discharge permit through the use of high-frequency sound. Adverse environmental impact; Traditional mitigation measures; Studies done on the...

  • Microprobe tests nuclear plant materials without harming vessel. Chambers, Ann // Power Engineering;Jun96, Vol. 100 Issue 6, p13 

    Reports that North Carolina State University's K. Linga Murty is developing a method to assess the condition and life expectancy of various metallic components in aging nuclear power plants. Adaptation of a stress-strain microprobe; Brittleness of steel nuclear plant components; System based on...

  • Cooperheat at eyes a hot opportunity. Pandya, Mukul // Business News New Jersey;11/13/96, Vol. 9 Issue 23, p34 

    Features Piscataway, New Jersey-based heat treatment company Cooperheat, that develops heat-related technologies for nuclear power plants. Specialization in the process called annealing; Completion of an annealing work for a reactor at a nuclear plant in Marble Hill in Indiana; Background on...

  • Autocatalytic Recombiner.  // Nuclear Plant Journal;Sep/Oct2011, Vol. 29 Issue 5, p13 

    The article offers brief information on the Passive Autocatalytic Recombiner (PAR) nuclear power plant hydrogen reduction system from Areva SA.

  • Containment Venting System.  // Nuclear Plant Journal;Sep/Oct2011, Vol. 29 Issue 5, p13 

    The article offers brief information on the Filtered Containment Venting System (FCVS) from Areva Inc.

  • Practical Advantages of OEM Contract Services.  // Nuclear Plant Journal;Jul/Aug2016, Vol. 34 Issue 4, p41 

    The article offers brief information on the Model 576AC SEVERMASTER Tube Severing Machine from machine tool manufacturer Tri Tool Inc.

  • Nuclear Plant Journal Product & Service Directory 2004.  // Nuclear Plant Journal;Nov/Dec2003, Vol. 21 Issue 6, p5 

    Presents the Product and Service Directory 2004 Issue of the U.S. international publication "Nuclear Plant Journal". Directory directions; List of advertisers; Products and services; Corporate capabilities; Corporate capabilities participants; Suppliers; Journal services.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics