TITLE

Upgrades improve Diablo Canyon's waste gas sampling system

AUTHOR(S)
Noman, Abid; Dubost, Edward
PUB. DATE
April 1995
SOURCE
Power Engineering;Apr95, Vol. 99 Issue 4, p51
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Describes Diablo Canyon power plant's improvement of its waste gas sampling system. Gas monitoring recommended; Sampling system design; Typical systems problems; Replacement of the solid state control system and recorder; Replacement of sample pump; Improved filtration and conditioning of sample streams; Enhanced instrumentation for setting system flows and troubleshooting.
ACCESSION #
9505033101

 

Share

Read the Article

Other Topics