TITLE

A Prototype Master Code of Accounting Structure to Facilitate Accurate Measures of Construction Labor Productivity across Multiple Projects

AUTHOR(S)
Dadi, Gabriel B.; Goodrum, Paul M.; Bonham, David
PUB. DATE
February 2014
SOURCE
World Journal of Neuroscience;Feb2014, Vol. 4 Issue 1, p49
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The United States National Academies identified several recommendations for the construction industry in 2009 to improve industry performance. One of the key recommendations was the development of reliable productivity measures to improve the efficiency and support of developing new construction innovations. Difficulty in measuring real output in the industry is a challenge that has prevented reliable productivity metrics. An alternative approach would be to consistently measure activity productivity across multiple construction projects throughout the United States and develop an aggregate measure accordingly. However, activity measures are inconsistent across both construction projects and even projects within the same company. Identifying an industry standard code of accounting would be a critical first step towards improving industry performance. The authors collected code of accounts from six large construction firms to identify the impact that code structure has on the ability to accurately measure labor productivity on a current along with the ability to estimate it on future projects as well. This paper focuses on mechanical piping code structure and productivity comparisons to the widely used industry estimating manuals produced by RSMeans Building Construction Cost Data and Richardson's Process Plan Construction Cost Estimating Standards (PPCES). The paper's contribution to the overall body knowledge illustrates the significance and degree of the impact that piping and conduit code structures related to diameter size, material type, and installation location have on accurately measuring productivity rates. The methods can be applied to other trade activities to develop an industry-wide standard code structure.
ACCESSION #
94739638

 

Related Articles

  • THE BIGGER THEY ARE.  // Business North Carolina;Nov2013, Vol. 33 Issue 11, p40 

    The article presents a list of the most expensive construction projects in North Carolina completed by general contractors as of June 30, 2012 which includes Duke University Hospital's Duke Medicine Pavilion, James B. Hunt Library and East Carolina University School of Dentistry.

  • Iconic designs Lead Best project Awards.  // ENR: Engineering News-Record;10/21/2013, Vol. 272 Issue 16, pMT23 

    The article offers information on the 2013 Best Projects competition in the U.S. Mountain States region.

  • Economics.  // ENR: Engineering News-Record;11/16/2015, Vol. 275 Issue 14, p6 

    The article reports decline in the Dodge Momentum Index in October 2015 with drop in planning for institutional building projects.

  • The Winning Candidates.  // ENR: Engineering News-Record;10/31/2016, Vol. 277 Issue 13, p4 

    The article discusses winners of the periodical's competition for the best projects in the U.S. featured in the issue and periodical's website ENR.com.

  • Construction Economics. Grogan, Tim // ENR: Engineering News-Record;5/21/2012, Vol. 268 Issue 15, p30 

    The article reports on the increase of the dollar value of total construction projects during the first quarter of 2012 in the U.S.

  • Another rise.  // International Construction;Dec2012, Vol. 51 Issue 10, p7 

    The article reports on the increase in construction output in the U.S. for the 12-month period ending September 2012 due to the year-on-year rise in privately funded construction.

  • Factors Affecting Labor Productivity in Saudi Arabia. Ali Shash, Ali; Alsagoub, Abdullah A. // AACE International Transactions;2014, p1 

    Productivity is an important key component in estimating the cost and the duration of any construction project. The accuracy of these estimates depends heavily on the reliability and precision of productivity estimates. For these reasons, estimators usually manipulate and modify productivity...

  • Yearly construction outlook scaled back slightly.  // Portable Plants & Equipment;Sep2015, Vol. 11 Issue 3, p8 

    The article reports on the expected growth in construction activities in the U.S. in 2015, according to consulting and investment banking services provider FMI Corp.

  • FAST TRACK WINNERS.  // Crain's Detroit Business;6/9/2014, Vol. 30 Issue 23, p0031 

    A partial list of the projects approved through an expedited sign-off process rather than approval by the Michigan Strategic Fund board is presented, which includes the Detroit Whole Foods project, the remodeling of a historic grocery store, and the renovation of two vacant buildings.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics