ABSTRACT
In the late 1980s, BNFL decided to enter the mixed oxide (MOX) fuel fabrication business to support our reprocessing business to and return the plutonium product to our customers in the usable forro of MOX fuel. The first phase of the strategy was to gain some irradiation experience for MOX produced by our own Short Binderless Route (SBR) process. To achieve this, the MOX Demonstration Facility (MDF) was built at Sellafiel, and 28 MOX fuel assemblies were produced up to 1998 that were loaded into PWRs in Europe. In 1994, BNFL started the construction of their large-scale MOX production plant, simulator modiciation package (SMP). The design and construction of the plant and supporting facilities were completed some years ago, and the commissioning of the plant with uranium commenced in June 1999. In October 2001, the United Kingdom government announced that the manufacture of MOX fuel in SMP was justified. On December 19, 2001, the U.K. regulators gave BNFL their approval to start plutonium operations. This paper considers the status of BNFL's MOX project today and the progress that we have taken towards achieving our business objectives.
ACCESSION #
9418669

 

Related Articles

  • BNFL gets reprieve on quality rating.  // Professional Engineering;01/26/2000, Vol. 13 Issue 2, p5 

    Reports that nuclear company BNFL has won a temporary reprieve from Lloyd's Register Quality Assurance, which considered removing the company's ISO 9002 quality management rating. Discovery of falsified quality control data at the mixed oxide fuel pilot plant of BNFL in September 1999.

  • New order for BNFL. Aldhous, P. // Nature;5/10/1990, Vol. 345 Issue 6271, p105 

    Reports that British Nuclear Fuels (BNFL) has signed a 225 million pound contract to reprocess 450 tons of reactor fuel from Lingen, West Germany in the twenty-first century. Plans also approved for BNFL to operate its nuclear reactors in Scotland and Cumbria.

  • Sellafield censure.  // New Scientist;2/22/92, Vol. 133 Issue 1809, p14 

    Reveals that British Nuclear Fuels has been heavily reprimanded by the country's nuclear safety watchdog after a potentially dangerous incident at the Sellafield complex. What took place; Plant has been shut down since September; What changes must take place.

  • British court approves plutonium processor.  // ENR: Engineering News-Record;3/28/94, Vol. 232 Issue 13, p23 

    Reports on the British court's approval to British Nuclear Fuels PLC to begin operation. Operation date; Number of metric tons of spent fuel to be chemically treated annually; Lawsuit filed against the government by the environmental group Greenpeace and the Lancashire County Council; Worry on...

  • Thorp in our side. Aubrey, Crispin // New Statesman & Society;11/5/93, Vol. 6 Issue 277, p30 

    Features the British Nuclear Fuels Ltd. (BNFL). Classification as a public company; Publicity; Issue on the company's Thorp reprocessing plant; Involvement with various governmental departments.

  • Reprocessing is challenged.  // ENR: Engineering News-Record;1/10/94, Vol. 232 Issue 2, p22 

    Reports on the January 13, 1994 hearing before the High Court in London that will determine the British Nuclear Fuels PLC's operation. Claims of the litigants; Intended beginning date of operation; Number of year the thermal oxide reprocessing plant (THORP) stand idle after contractors finished...

  • Quality terms for non-quality personnel. Fine, Edmund // Industrial Paint & Powder;Mar99, Vol. 75 Issue 3, p46 

    Defines several Quality Assurance terminologies. Includes attribute data; Average; Control chart; Control limit; Nonrandom patterns; Process capability.

  • Quality in the First Person. Phillips-Donaldson, Debbie // Quality Progress;Aug2003, Vol. 36 Issue 8, p6 

    Invites readers to write their views and experiences in the quality assurance field under the title 'Quality in the First Person.' Estimated number of words allowed for publication; Inportance of personal involvement in quality assurance.

  • Short runs.  // Quality Progress;Aug2003, Vol. 36 Issue 8, p16 

    Presents news related to quality assurance as of August 2003. Quality Press' publication of its first electronic book titled 'ISO 9001-2000 Interpretative Guide for the Design and Construction Project Team; Schedule of the National Quality Institute of Canada's summit and celebration of 2003...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics