TITLE

THE NEXT GENERATION

AUTHOR(S)
Seydel, Carie A.
PUB. DATE
March 2003
SOURCE
Airman;Mar2003, Vol. 47 Issue 3, p28
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Discusses the future of evolved expendable launch vehicles in the U.S. Atlas V, the first evolved expandable launch vehicle; Delta IV; Role of airmen at the range operations control center. INSET: It's in the air.
ACCESSION #
9413562

 

Related Articles

  • Proton loss mars Russia's mir success. Covault, Craig // Aviation Week & Space Technology;2/26/1996, Vol. 144 Issue 9, p65 

    Reports on the impact of the explosion of a Russian Proton booster on the United States/Russian commercial launch. Details on the successful launching of a Russian fighter mir.

  • USAF Titan 34Ds cleared for launch. Scott, W.B. // Aviation Week & Space Technology;7/20/87, Vol. 127 Issue 3, p26 

    A successful static firing of a solid rocket motor last month at Edwards AFB, CA has led to expectations the Air Force will resume launches of military payloads with Titan 34D rockets in the near future. Such a move would restore the service's ability to put critical classified satellites into...

  • Military launcher program meeting critical.. Smith, B.A.; Scott, W.B. // Aviation Week & Space Technology;2/1/88, Vol. 128 Issue 5, p36 

    1988 will be a pivotal year for the Defense Dept.'s $11.7 billion space recovery program, with the introduction of three new expendable launch vehicles and a contract for a fourth class of launch vehicle. The ten-year recovery effort has already reached an important milestone this year, the...

  • Second firm seeks access to expended... Foley, T.M. // Aviation Week & Space Technology;4/11/88, Vol. 128 Issue 15, p21 

    Global Outpost Inc. of Virginia has become the second entrepreneurial company seeking to convert expended space shuttle external tanks into private orbital facilities. External Tanks Corp. already stated its intent to convert the tanks to pressurized, orbital living and laboratory facilities....

  • Parts shortage delays Delta 2 launch of...  // Aviation Week & Space Technology;6/13/88, Vol. 128 Issue 24, p21 

    The first launch of the Delta 2 booster has been delayed several weeks due to parts shortages resulting form the rapid startup of the Delta production line at McDonnell Douglas. Delta 2 was developed to deploy the Navstar satellite constellation.Delays; Effects; Navstar uses.

  • Orbital Sciences charts rapid growth with... Stodden, J.R. // Aviation Week & Space Technology;6/27/1988, Vol. 128 Issue 26, p51 

    Orbital Sciences Corp. is staking half its future growth on a second commercial space project, the Pegasus air-launched space booster. Reports on development of Pegasus; Expected sales; 1989 first flight and subsequent launch schedule and payloads.

  • Pegasus commercial launch project to begin rocket motor test firings. Covault, C. // Aviation Week & Space Technology;2/13/1989, Vol. 130 Issue 7, p91 

    Discusses the upcoming first test firing of a rocket engine for the Pegasus winged space booster, which initiates a series of tests for the Orbital Sciences Corp./Hercules vehicle, to be launched by a NASA/Boeing B-52 bomber. Test series; Subcontractors; Roles.

  • Titan fairing undergoes tests.  // Aviation Week & Space Technology;5/1/1989, Vol. 130 Issue 18, p89 

    Shows a commercial satellite fairing, built by Contraves for the Martin Marietta commercial Titan program, undergoing testing.

  • First commercial Titan prepared for September launch.  // Aviation Week & Space Technology;5/1/1989, Vol. 130 Issue 18, p97 

    Report that the first Martin Marietta Commercial Titan launch vehicle has arrived at Cape Canaveral for processing prior to its September launch of two communications satellites. Payload; Launch contracts; Launch capabilities.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics