TITLE

Spaceplane finds friends despite official delay

AUTHOR(S)
Hughes, S.
PUB. DATE
February 1992
SOURCE
New Scientist;2/1/92, Vol. 133 Issue 1806, p18
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Reports on the heads of four European aerospace companies signing an agreement last week to create Euro-Hermespace, a corporation to develop the European spaceplane Hermes. Amount of stock each company will own; The president of the corporation's supervisory board will be Johann Schaffler.
ACCESSION #
9202175083

 

Related Articles

  • NASA nears key shuttle tests. Covault, C. // Aviation Week & Space Technology;7/6/87, Vol. 127 Issue 1, p28 

    President Ronald Reagan received a detailed NASA report last week on the shuttle program's recovery from the Challenger accident. The space shuttle program is nearing important vehicle checkout and crew escape system tests to enable launch of theorbiter Discovery next June. New shuttle launch...

  • Panel backs space station design... Foley, T.M. // Aviation Week & Space Technology;9/21/1987, Vol. 127 Issue 12, p28 

    A National Research Council committee has reviewed NASA's space station program for the White House and found its design to be satisfactory. But the project could be endangered by new cost increases, management deficiencies and too much reliance on the current space shuttle. The report drew...

  • New space launch manifest integrates shuttle.  // Aviation Week & Space Technology;10/26/1987, Vol. 127 Issue 17, p30 

    NASA has completed a new space launch manifest. It combines both manned shuttle and expendable booster missions into a single plan, initiating the new US launch strategy adopted after the Challenger accident. The White House Office of Management and Budget, however, is not entirely happy with...

  • NASA changing shuttle payloads to retrieve... Covault, C. // Aviation Week & Space Technology;2/8/88, Vol. 128 Issue 6, p30 

    NASA must change its shuttle payload schedules because its long-duration exposure facility satellite, launched in 1984, is decaying from orbit faster than predicted. The 21,400-pound vehicle must be retrieved before it falls to Earth. Shuttle planning is also affected by the need to protect...

  • Tests examine shuttle booster's outer... Dornheim, M.A. // Aviation Week & Space Technology;5/2/88, Vol. 128 Issue 18, p95 

    NASA is continuing to evaluate the design of the outer nozzle boot attach ring in the space shuttle solid rocket motor. The attention follows a recent failure in flight (the 51-J mission) and during recent test firings. Tests, findings, nozzle boot design, NASA design criteria.

  • US space shuttle set for rollout to launch... Covault, C. // Aviation Week & Space Technology;6/13/1988, Vol. 128 Issue 24, p20 

    The space shuttle Discovery is ready for transfer to a launch pad at Kennedy Space Center. It has redesigned rocket boosters and extensive modifications, and the launch follows two and one-half years of NASA/contractor recovery efforts after the Challenger accident. Resumption of US manned...

  • Space shuttle moved to Pad 39B in key step.. Kolcum, E.H. // Aviation Week & Space Technology;7/11/1988, Vol. 129 Issue 2, p34 

    Discusses the move of the space shuttle orbiter Discovery to Launch Pad 39B on July 4, and the milestones yet to be accomplished before launch on Mission 26. Milestones; Concerns; Rollout; Boosting worker morale.

  • Sluggish fuel bleed valve delays shuttle... Kolcum, E.H. // Aviation Week & Space Technology;8/8/1988, Vol. 129 Issue 6, p23 

    Discusses the cancellation and rescheduling of a critical flight readiness firing test of space shuttle Discovery's main engine when NASA discovered a sluggish fuel bleed valve. Valve operation, possible fixes, vent line repair, deletion of planned special tests.

  • Shuttle engine pump issue develops after... Kolcum, E.H. // Aviation Week & Space Technology;8/22/1988, Vol. 129 Issue 8, p20 

    Reports on the August 10 flight readiness firing of the main engines of the orbiter Discovery that resulted in the finding of a leak in an OMS pod. The leak caused a liquid-oxygen pump to move more than in previous firings. Test firing and findings; Repairs; FRF (flightreadiness firing) test...

  • ASRM competition focuses on manufacturing... Scott, W.B. // Aviation Week & Space Technology;8/22/1988, Vol. 129 Issue 8, p84 

    Discusses competition for a $1 billion contract to develop and manufacture NASA's advanced solid rocket motor for the space shuttle system. The winning contractor team will need to produce at least 32 advanced solid rocket motors a year, while achieving quality, reliability and cost savings, so...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics