TITLE

GAO cites faulty test equipment for hampering EW system readiness

AUTHOR(S)
Nordwall, B.D.
PUB. DATE
October 1989
SOURCE
Aviation Week & Space Technology;10/9/1989, Vol. 131 Issue 15, p133
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Discusses a General Accounting Office (GAO) survey that shows a high rate of faulty and unreliable built-in test (BIT) equipment in the Air Force's electronic warfare systems, hampering them from performing up to standards. Operational concept; Failures; GAO criticisms and responses.
ACCESSION #
8910231413

 

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics