ABSTRACT
The article focuses on the project of Barnhart Crane & Rigging Co. which is to replace and install eight components in a nuclear plant. It says that Barnhart is known for its engineer solutions that are time- and cost-effective. It states that the scope of the project is to give planning, engineering and fabrication with equipment, labor, and supervision to execute eight scopes of work for the upgrade.
ACCESSION #
87654653

 

Related Articles

  • Obstacle course.  // American Cranes & Transport;2013 AC&T Sourcebook, p15 

    The article focuses on the project of Barnhart Crane & Rigging on removing and replacing the four feedwater heaters at the Point Beach Nuclear Station (PBNS) in Two Rivers Wisconsin which is considered as one of the 2012 Jobs of the Year of Specialized Carriers & Rigging Association (SC&RA). It...

  • Wide range. Youdale, Euan // International Cranes & Specialized Transport;Jul2009, Vol. 17 Issue 10, p34 

    The article focuses on the benefits on the use of hydraulic gantries in transporting complex and different equipment. It notes various gantry systems which include a project from Barnhart Crane & Rigging where they need to install a reactor in a petroleum plant in Billings, Montana, and the...

  • Vexing vessels.  // International Cranes & Specialized Transport;Jun2011, Vol. 19 Issue 9, p38 

    The article focuses on the removal and replacement of two horizontal vessels at an existing structure in Southern Carolina in which Barnhart Crane & Rigging Co. was contracted to provide supervision, labour, and equipment for the effort. It says that the engineering team planned to remove the...

  • Rigger uses brains and brawn to move 704-ton refinery heater. Phair, Matthew // ENR: Engineering News-Record;02/02/98, Vol. 240 Issue 5, p14 

    States that Barnhart Crane & Rigging Company is moving a 704-ton refinery heater more than a mole without disassembling it. Comments from Don Nolan, Banrhart project manager; Information on the construction company who won the contract; Detailed information on the moving process.

  • New branch opens at Port of Monroe.  // Toledo Business Journal;Oct2011, Vol. 27 Issue 10, p21 

    The article reports that Barnhart Crane and Rigging Co. is making investment of 5 million dollars to open its newest branch at the Port of Monroe, Michigan.

  • Buoyant Tower design offers flexibility, improves float-over operation. Chia, J. P. // Offshore;Nov2013, Vol. 73 Issue 11, p102 

    The article discusses innovations within the petroleum industry which lead to the development of the concept for the oil platform called Buoyant Tower. It states that Buoyant Tower is designed to minimize time from offshore exploration to production while the concept supports fabrication and...

  • Obstacle course.  // International Cranes & Specialized Transport;Jun2012, Vol. 20 Issue 9, p41 

    The article evaluates the Goldhofer self propelled modular trailer (SPMT) systems from Barnhart Crane and Rigging Co.

  • Big Al. Shiffler, D. Ann // American Cranes & Transport;Apr2012, Vol. 8 Issue 4, p43 

    The article offers information on the "Big Al" barge-mounted crane from Barnhart Crane & Rigging Co.

  • Reactor replacement.  // American Cranes & Transport;May2010, Vol. 6 Issue 5, p33 

    The article focuses on the reactor replacement project of Barnhart Crane & Rigging Co. which uses various heavy lift systems including the Head Rigging Frame (HRF), the Replacement Reactor Vessel Closure Head (RRVCH), and the Outside Lifting System (OLS).

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics