TITLE

ILLINOIS: I-355 Redux

AUTHOR(S)
Shields, Yvette
PUB. DATE
January 2002
SOURCE
Bond Buyer;1/16/2002, Vol. 339 Issue 31305, p33
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports on the plan of the Illinois State Toll Highway Authority officials to extend the project Interstate 355. Estimated costs of the project; Reason why the project has been repeatedly postponed; Requirements of maintaining coverage levels and credit ratings of the bond issues to fund the extension.
ACCESSION #
8533058

 

Related Articles

  • N12 EXPANSION: BUILDING A NEW SUPERCLASS HIGHWAY.  // Civil Engineering (10212000);Jan2012, Vol. 20 Issue 1, p56 

    The article reports on the construction of toll route system National Route 12 (N12) under the Gauteng Freeway Improvement Project (GIFP) in South Africa.

  • E-470 stuck in legal bog. Korman, Richard // ENR: Engineering News-Record;1/31/94, Vol. 232 Issue 5, p36 

    Reports on the stats of construction of the E-470 beltway in Denver, Colorado. Litigation due to project realignment; Lack of long-term financing; Pending decision from the state Supreme Court.

  • Early finish possible at Dulles extension.  // ENR: Engineering News-Record;9/12/94, Vol. 233 Issue 11, p22 

    Reports on the construction of the 14-mile-long toll road extension in Virginia. Extension of an existing toll road from the Washington, D.C. Beltway to Dulles-Washington International Airport; Value of the overall construction contract; Brown & Root as the major contractor; Predictions of...

  • Toll Road Update.  // Bulverde Standard (Canyon Lake, TX);10/3/2007, Vol. 23 Issue 40, p14 

    The article reports that the Alamo Regional Mobility Authority Board of Directors has authorized the release of a design build request for qualification for the 281 North toll project in San Antonio, Texas.

  • PRESIDENT GEORGE BUSH TURNPIKE, WESTERN EXTENSION.  // Roads & Bridges;Oct2012, Vol. 50 Issue 10, p28 

    The article highlights the President George Bush Turnpike-Western Extension found in Grand Prairie Texas and commissioned by the North Texas Tollway Authority with a total cost of 416 million U.S. dollars.

  • Loop 9 revived.  // Ellis County Press;5/9/2013, Vol. 22 Issue 5, p3 

    The article offers the author's view on revived discussions on the construction of the proposed Loop 9 toll road in Texas.

  • Prelim work begins on SH 45, north of Hays. Biundo, Jen // Hays Free Press (Buda, TX);7/11/2007, Vol. 104 Issue 14, p1A 

    The article reports that contractors for the Texas Department of Transportation will start the construction on State Highway 45 Southeast, a seven-mile toll road that will connect IH-25 with state highway 130 at Highway 183.

  • In brief.  // International Construction;Sep97, Vol. 36 Issue 9, p7 

    Reports that Midland Expressway has won a $655 million contract to build the first toll motorway in Great Britain.

  • Consortium gets tollroad go-ahead.  // American City & County;Jun97, Vol. 112 Issue 6, p69 

    Announces that in Phoenix, Arizona the state transportation board has given permission to a group of private companies to discuss the possible building of a toll road facility for the East Valley region of the Metropolitan area. What is the project called; Modification of express lanes;...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics