ABSTRACT
There is a number of cases reported for pipeline failures both in onshore and offshore situation. In order to minimize such failure, there is a need to clearly understand the failure mechanisms, governing factors and further analysis of data can determine the cause and extent of failure. In this study Analytical Hierarchy Process (AHP) was used to determine the risk factor for pipeline failure of the chosen system. AHP provides the multiple criteria scoring results based on expert judgement for prioritizing the pipeline maintenance strategy. For this case study two pipelines networks administered by two different operators, the first one in Malaysia and the other one in Indonesia were chosen. From the analysis of the data obtained by interviewing the pipeline engineers from Malaysia operator, it was obtained that highest risk factor i.e. 41.7% for pipeline failure involved internal corrosion; the other factors in descending order are internal erosion, external impacts, external corrosion, free span and on-bottom stability. From the analysis of Indonesian pipeline, failure due to system operation involved the highest risk factor i.e. 34.7%; other factors are design index, maintenance, and third party index.
ACCESSION #
76125791

 

Related Articles

  • Research on the Risk Evaluation of Construction Stage Base on Analytical Hierarchy Process for Building Engineering Projects. ChangHong Jin // Advanced Materials Research;2014, Issue 1044-1046, p135 

    The thinking way of Analytical Hierarchy Process (AHP) is to decompound a complicated risk problem according to layers, and to carry through judgment and calculation among the risk factors of the same layer to get the risk level of different schemes, and to provide decision basis for the choice...

  • SYSTEM SAFETY IN LPG FIRED FURNACE - A MULTI CRITERIA DECISION MAKING TECHNIQUE. Georgekutty Mangalathu, S.; Siva Shanmugam, N.; Sankaranarayanasamy, K.; Ramesh, T.; Muthukumar, K. // Advances in Production Engineering & Management;Jun2012, Vol. 7 Issue 2, p123 

    Risk and safety are the important terms related with any industry and are linked conceptually and pragmatically. This paper illustrates the risk associated with an LPG fired furnace. The major risks involved in an LPG based gas furnaces are: leakages in the main LPG pipelines and improper...

  • Comparison of power plants' risks with multi criteria decision models. Regős, Gábor // Central European Journal of Operations Research;Dec2013, Vol. 21 Issue 4, p845 

    The aim of the paper is to compare the general risk of the four most important energy chains (coal, nuclear, gas, hydro). Two different multi-criteria decision models, the Analytic Hierarchy Process and the PROMETHEE method have been applied. The chosen risk criteria are: severe accidents,...

  • RETRACTED ARTICLE: GIS-based landslide susceptibility mapping using analytical hierarchy process (AHP) and certainty factor (CF) models for the Baozhong region of Baoji City, China. Chen, Wei; Li, Wenping; Hou, Enke; Li, Xiaoqin // Environmental Earth Sciences;Apr2015, Vol. 73 Issue 7, p3951 

    A retraction of the article "GIS-based landslide susceptibility mapping using analytical hierarchy process (AHP) and certainty factor (CF) models for the Baozhong region of Baoji City, China" that was published online on October 9, 2014 is presented.

  • Application of comprehensive evaluation and sensitive analysis in certain equipment. XIE Ning; LI Shuai; LI Di; WANG Xiaofei // Applied Mechanics & Materials;2014, Vol. 713-715, p1622 

    In this paper,it is mainly based on the characteristics of index of some equipment, analyses the correspondence between first class index and second class index, studies the calculation of weigh index. Several methods including linear weighted method, Comprehensive fuzzy evaluation method, and...

  • Application of a triangular fuzzy AHP approach for flood risk evaluation and response measures analysis. Yang, Xiao-ling; Ding, Jie-hua; Hou, Hui // Natural Hazards;Sep2013, Vol. 68 Issue 2, p657 

    Flood risk evaluation and prediction represents an essential analytic step to coherently link flood control and disaster mitigation. The paper established a hybrid evaluation model based on fuzzy analytic hierarchy process (AHP) and triangular fuzzy number. It comprises flood risk evaluation and...

  • Analytic Network Process (ANP) to Risk Assessment of Gas Refinery EPC Projects in Iran. Valipour, Ali Reza; Sarvari, Hadi; Yahaya, Nordin; Norhazilan Md Noor; Rashid, Ahmad Safuan A. // Journal of Applied Sciences Research;Mar2013, Vol. 9 Issue 3, p1359 

    Risk assessment is the most significant factors in risk management. Earlier researches have shown that risk assessment is essential to achieve success in Engineering, Procurement and Construction projects(EPC). The occurrence of different risk can worsen the effects of each other such as the...

  • Risk Assessment Model and Empirical Research of Industrial clusters. Yong-heng Fang; Ting Wang // Advanced Materials Research;2014, Issue 889-890, p1585 

    The paper puts forward a kind of evaluation method of risk assessment of industrial clusters based on the Fuzzy Analytic Hierarchy Process. Combined with investigating findings, a system of risk assessment has been set up applying the Fuzzy Analytic Hierarchy Process; the risk of the Baoji...

  • Assessment and Response of UAV Development. Fajie WEI; Panpan XIE; Guolin LI // Applied Mechanics & Materials;2014, Issue 644-650, p6269 

    With large number of participants, tight development time, high technical standards, there is great uncertainty and risk during doing researching on Unmanned Aerial Vehicle (UAV for short). This article makes a count on the accidents' data of the past 30 years and analyses the causes of these...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics