TITLE

W10 East Coast by April 2014

PUB. DATE
May 2012
SOURCE
Rail Business Intelligence;5/17/2012, Issue 414, p3
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on a confirmation by Network Rail Ltd. that there should be a route cleared to the W10 loading gauge between the North London Line and the Scottish border at Berwick-upon-Tweed by the March 31, 2014.
ACCESSION #
76114274

 

Related Articles

  • WCML RUS strengthens case for HS2.  // Rail Business Intelligence;1/13/2011, Issue 381, p9 

    The article reports that Network Rail Ltd. released the Route Utilization Strategies, covering the West Coast Main Line from London Euston to Carstairs and its branches in England, for consultation on December 8, 2010.

  • NR spends £15m on ECML.  // Rail Business Intelligence;10/3/2013, Issue 447, p1 

    The article reports that Network Rail Ltd. (NR) is planning to invest 15 million pounds for improving its infrastructure on the East Coast Main Line in London, England.

  • ETCS trials enter second phase.  // Rail Business Intelligence;10/3/2013, Issue 447, p2 

    The article reports that Network Rail Ltd. has announced that its European Train Control System (ETCS) National integration Facility has started successfully and has entered its second stage.

  • Phase 1 of Northwest electrification misses 'final' deadline.  // Rail Business Intelligence; 

    The article reports that the deadline for handing over Phase 1 of the Northwest Triangle programme was missed once again by Network Rail Ltd.

  • Market studies look 30 years ahead.  // Rail Business Intelligence; 

    The article reports that Network Rail Ltd. has announced the publication of four market studies aimed to forecast demand over the next 10 to 30 years.

  • Progress on the Cumbrian coast.  // Modern Railways;May2011, Vol. 68 Issue 752, p16 

    The article reports on the good progress in the initial stages of major work at the southern part of the Cumbrian coast route despite the stormy weather in North West England in March 2011, which is based on the statement issued by Network Rail.

  • Better Shrewsbury timings wanted.  // Rail Business Intelligence;12/12/2013, Issue 452, p4 

    The article reports that the proposed Virgin Trains service by Network Rail Ltd. between Shrewsbury and London Euston have received a critical response from local authorities and businesses.

  • POINTERS.  // Rail Business Intelligence;1/26/2012, Issue 406, p1 

    The article offers news briefs related to Great Britain's railroad industry including Network Rail Ltd.'s "alliance framework agreements," with Abellio Greater Anglia, increase in the speed limit of Eurotunnel shuttle trains by 20 km/h and the public event to be organized by Network Rail.

  • Deferred enhancements save £1.2bn.  // Rail Business Intelligence;5/3/2012, Issue 413, p7 

    The article reports that the British Office of Rail Regulation (ORR) has agreed a number of changes to Network Rail Ltd.'s (NR) enhancements programme for Control Period 4 (CP4), and total forecast enhancement expenditure in CP4 is now 1.2 billion pounds less than in NR's 2011 Delivery Plan.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics