TITLE

Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites

AUTHOR(S)
Cubbage, Amy E.
PUB. DATE
May 2012
SOURCE
Federal Register (National Archives & Records Service, Office of;5/18/2012, Vol. 77 Issue 97, p29701
SOURCE TYPE
Government Documents
DOC. TYPE
Article
ABSTRACT
The article presents information on a notice issued by the U.S. Nuclear Regulatory Commission (NRC) regarding issuance of a guidance related to impact of construction of nuclear power plants. The guidance will help the NRC officials during nuclear power plants licensing activities. The notice will be effective by June 18, 2012.
ACCESSION #
76112127

 

Related Articles

  • Virginia Electric and Power Company, Surry Power Station Units 1 and 2 and North Anna Power Station Units 1 and 2, Notice of Withdrawal of Application for Amendment to Facility Operating License. Sreenivas, V. // Federal Register (National Archives & Records Service, Office of;10/16/2012, Vol. 77 Issue 200, p63342 

    The article presents a notice issued by the U.S. Nuclear Regulatory Commission for granting the request filed by Virginia Electric and Power Co. to wihdraw its application related to a proposal for amending its facility operating license. The notice has been issued for two nucleear power plants...

  • Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. Boyce, Thomas H. // Federal Register (National Archives & Records Service, Office of;5/21/2012, Vol. 77 Issue 98, p30030 

    The article presents information on a notice issued by the U.S. Nuclear Regulatory Commission regarding the revision of its regulatory guide titled "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." This guidance assists the agency officials during emergency operating...

  • Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations. Evans, Michele G. // Federal Register (National Archives & Records Service, Office of;10/16/2012, Vol. 77 Issue 200, p63343 

    The article presents a notice issued by the U.S. Nuclear Regulatory Commission to inform public about the modifications made in the nuclear power plants licenses. The notice has been issued after analyzing that modifications made in the operating license do not cause hazards to the environment....

  • V. C. Summer Nuclear Station, Units 2 and 3 Combined Licenses and Record of Decision. Tonacci, Mark // Federal Register (National Archives & Records Service, Office of;4/10/2012, Vol. 77 Issue 69, p21593 

    The article presents information on a notice issued by the U.S. Nuclear Regulatory Commission (NRC) regarding issuance of combined construction and operating license to South Carolina Electric and Gas Co. and Santee Cooper, South Carolina Public Service Authority for two new nuclear power plants...

  • Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria. Vietti-Cook, Annette L. // Federal Register (National Archives & Records Service, Office of;8/28/2012, Vol. 77 Issue 167, p51880 

    The article reports a notice of final rule issued by the U.S. Nuclear Regulatory Commission (NRC) regarding verification of nuclear power plant construction activities via inspections, analyses, and acceptance criteria through a combined license. It also mentions that NRC intends to make...

  • NUCLEAR REDUX. Crane, Bill // Georgia Trend;Nov2015, Vol. 31 Issue 3, p17 

    The author discusses the safety operation and emission-free generation in U.S. nuclear power plants which highlights the re-licensed operation until 2040 of the Alvin W. Vogtle Electric Generating Plant of electric utility company Georgia Power. Topics discussed include the increased capacity of...

  • Nuclear Renaissance Dims as Costs Rise, Demand Slows. Judy, Scott // ENR: Engineering News-Record;5/20/2013, Vol. 270 Issue 14, p26 

    The article looks at cancellations or delays of U.S. nuclear power plant projects due to financial or regulatory concerns. The U.S. Nuclear Regulatory Commission (NRC) rejected an license application for a nuclear project in Texas by Nuclear Innovation North America. The Kewaunee nuclear plant...

  • Guidelines for Preparing and Reviewing Licensing Applications for Instrumentation and Control Upgrades for Non-Power Reactors. Quichocho, Jessie F. // Federal Register (National Archives & Records Service, Office of;7/12/2012, Vol. 77 Issue 134, p41206 

    The article presents information that the U.S. Nuclear Regulatory Commission (NRC) is soliciting comments on two guidelines titled "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content" and "Guidelines for Preparing and Reviewing...

  • Nuke plants on hold.  // New Scientist;8/18/2012, Vol. 215 Issue 2878, p5 

    The article reports on an August 8, 2012 decision by the U.S. Nuclear Regulatory Commission (NRC) that prohibits the licensure of additional nuclear power plants and the renewal of existing nuclear plant licenses until a solution for the disposal of U.S. nuclear waste can be found.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics