TITLE

Corrosion Prevention

PUB. DATE
April 2012
SOURCE
Transmission & Distribution World Exclusive Insight;4/16/2012, p1
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article provides information on the complete maintenance package offered by the Eliminate the Movement program of PPG's Keeler & Long to the power transmission industry, which includes free structure grid evaluation, application consultations and paint specification proposals.
ACCESSION #
75649749

 

Related Articles

  • Tech talk.  // Motor Age;Jan96, Vol. 115 Issue 1, p42 

    Presents tips on insuring precise belt tension for automobile engines.

  • Construction equipment...  // PS: Preventive Maintenance Monthly;May98, Issue 546, p26 

    Illustrates the proper way of shifting the gears of construction equipment. Negative results of improperly shifting the gear of a construction equipment.

  • Skid marks. Morley, David // Motor;Nov99, p101 

    Describes a mechanical problem in a motorcycle's throttle cable. Number of cables connected to the throttle; Results of repair work on the motorcycle.

  • Spares Spare You Trouble In Field.  // PS: Preventive Maintenance Monthly;Jan2004, Issue 614, p16 

    Presents letters to the editor concerning preventive maintenance, compiled as of January 2004. Use of adapters to protect cable connectors; Replacement of a damaged road wheel.

  • Torque measurement system helps pinpoint machine drive problems. Wozniak, Mike // Pulp & Paper;Oct96, Vol. 70 Issue 10, p65 

    Discusses the importance of determining the actual torque transmitted through drives and driven components to bridge the gap between electrical power control and mechanical torque in modern paper mill maintenance. Telemetry system; System testing; Future applications.

  • In search of a higher intelligence.  // Modern Power Systems;Sep2006, Vol. 26 Issue 9, p11 

    The article focuses on the significance of a project intended to provide a framework for the development of the intelligent, self-repairing power transmission system, in Poland. The transmission system operator, PSE-Operator SA, started the first demonstration project based on the fast...

  • Cable work accelerated on WCML.  // Modern Railways;Jul2008, Vol. 65 Issue 718, p14 

    The article reports that almost 14 miles of signaling power cables is to be replaced in the Bletchley area in England by July 2008 for ten weeks under an accelerated program of renewal in the Milton Keynes and Bletchley areas. The renewal program is part of the West Coast route modernization...

  • Is Your VFD Clean, Dry, and Tight? Polka, Dave // Paper, Film & Foil Converter;Mar2002, Vol. 76 Issue 3, p62 

    Presents steps in maintaining variable-frequency drives. Ways to keep the drives clean; Protection of the drives from moisture; Importance of checking the drives' connections; Inspection of direct current bus capacitors.

  • Chapter Seven -- Transmission and Shift Mechanism (2006 Models).  // Harley-Davidson FLS/FXS/FXC Softail Series, 2006-2010;2014, p270 

    An introduction to a series of articles that describe the service procedures for the transmission and shift mechanisms of the 2006 Harley-Davidson FLS/FXS/FXC Softail motorcycle models is presented.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics