TITLE

ARIZONA: Sewer Deal Set

AUTHOR(S)
Victory, Darren
PUB. DATE
December 2001
SOURCE
Bond Buyer;12/11/2001, Vol. 338 Issue 31282, p31
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports on the sale of 463 million dollars in revenue bonds by Lake Havasu City, in Arizona, to finance construction of a sewage disposal system. Population and septic tanks in the city; Environmental tests conducted in the city; Objectives behind the sale according to its financial advisor.
ACCESSION #
7511792

 

Related Articles

  • Drainfield tips. Anderson, Kris // Countryside & Small Stock Journal;May/Jun2001, Vol. 85 Issue 3, p19 

    Offers tips on how to care for the drainfield of septic tanks.

  • LIFE IN THE SEPTIC TANK. Anderson, Jim // Pumper;Apr2012, p86 

    The article provides an answer to a question of what things affect the biology of septic tank.

  • Avoid the Deep Freeze. KNEISZEL, JIM; Olin, Jonny // Cabin Living;Oct2015, p20 

    The article presents an answer to a question about dealing with a septic system problem in winter.

  • ©Pumper.com.  // Pumper;Sep2014, p14 

    The article offers information on the journal's web site located at www.pumper.com.

  • Septic Tanks: One of Camp's Dirtiest Little Secrets. Stryker, Rick // Camping Magazine;Jan/Feb2003, Vol. 76 Issue 1, p60 

    Presents questions and answers about subsurface sewage disposal systems. Need to pump the septic tank; Required size of the septic tank; Care and feeding of the septic tank.

  • What Are the Keys to Customer Service?  // Pumper;Nov2015, p76 

    The article presents questions and answers related to septic service companies offering snake lines.

  • Marco Island, Fla., Counsel to Argue For $5M Sewer Deal Before High Court. Sigo, Shelly // Bond Buyer;12/21/2006, Vol. 358 Issue 32533, p4 

    The article reports on the appearance of bond counsel for Marco Island before the Supreme Court to argue for the city's right to issue about $5 million of sewer assessment bonds in Florida. A bond-financed septic tank replacement program is implemented by the city. About $75 million is needed...

  • Aerobic Remediation: Wave of the Future in Wastewater Treatment.  // Journal of Environmental Health;Jul/Aug2010, Vol. 73 Issue 1, p30 

    The article offers information on the Aero-Stream® Remediator® for septic systems.

  • System Manufactions: Why, Wherefores and Fixes. Lentz, David // Onsite Installer;Jul2012, p16 

    The article discusses the value of a thorough inspection in pinpointing the root cause of onsite wastewater treatment system failures and identifying the best remedy. Homeowner usage habits, siting and septic tank function are reportedly the most common causes, with affecting factors being...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sign out of this library

Other Topics