Maneuver Sustainment for Army Transformation

Toler, Larry L.
July 2002
Army Logistician;Jul/Aug2002, Vol. 34 Issue 4, p2
Discusses the tasks of Army logisticians to achieve maneuver sustainment goals in support of the Army Transformation war game in the U.S. Reduction of logistics footprint in the combat zone; Decrease of deployment timelines; Cutting of the total cost of logistics while maintaining the warfighting capability.


Related Articles

  • Runnin' On Empty? Caldwell, John A.; Brown, Lex // Flying Safety;Mar2003, Vol. 59 Issue 3, p4 

    Deals with the strategies for dealing with operational fatigue which occurs during military sustained operations, which include non-pharmacological and pharmacological strategies.

  • Joint Tactical Terminal and Common Integrated Broadcast Service--Modules (JTT/CIBS-M). Kostek, Stephen R. // Military Intelligence Professional Bulletin;Oct-Dec98, Vol. 24 Issue 4, p33 

    Discusses the significance of the Joint Tactical Terminal (JTT) Common Integrated Broadcast-Modules (JTT/CIBS-M) program. Features of the JTT which address the combat forces' need for tactical intelligence and targeting information; Integrated Broadcast Service(IBS) intelligence networks;...

  • The Army XXI heavy division--first blueprint of the future army. Steele, Dennis // Army Magazine;Jul98, Vol. 48 Issue 7, p33 

    Focuses on the US Army's restructuring of its heavy combat division structure for Army XXI. Goal of making armored and mechanized formations more deployable and agile; Establishment of digitization priorities for combat formations; Three-axis development method; Plan to increase combat power...

  • It's Not Over 'Til It's Over. Coenen, Joseph R.; Bryant, Alvin L. // Approach: The Naval Safety Center's Aviation Magazine;Jul/Aug2008, Vol. 53 Issue 4, p19 

    A personal narrative is presented which explores the author's experience of operating an aircraft for his strike-training mission together with his Weapons Systems Officer (WSO) through a six-week detachment at the El Centro, California.

  • USS George H.W. Bush Conducts First Missile Launch. St. Clair, J. Scott // All Hands;Aug2010, Issue 1121, p38 

    The article reports on USS George W. Bush's (CVN77) launch of two evolved NATO Sea Sparrow missiles and two Rolling Airframe missiles (RAM) as part of the combat systems ship's qualification trials (CSSQT).

  • Somalia's prime minister appealed for international support to combat al Shabaab militants.  // African Business News;9/27/2013, p1 

    The article reports that the prime minister of Somalia has appealed for international support to combat al Shabaab militants.

  • OBJECTIVE FORCE WARRIOR BEGINS DETAILED DESIGN.  // Army Logistician;Sep/Oct2003, Vol. 35 Issue 5, p46 

    Reports on the awarding of a contract to Eagle Enterprise Inc. for the development of the U.S. Army's Objective Task Force Warrior Program. Background of the transformation program; Combat preparedness and military technology.

  • One-stop shopping at CECOM. Bannister, Kathleen A. // Army Logistician;Jan/Feb99, Vol. 31 Issue 1, p140 

    Focuses on the United States Army Communications-Electronics Command's (CECOM) creation of Electronic Sustainment Support Centers (ESSC) to provide `one-stop shopping' for command, control, communications, computer and intelligence and electronic warfare maintenance. Historical perspective of...

  • LOG LEADERS DISCUSS TRANSFORMATION.  // Army Logistician;Jul/Aug2002, Vol. 34 Issue 4, p1 

    Highlights the annual Senior Commanders conference in Richmond, Virginia. Forum for combat service support commanders; Discussion of logistics initiatives; Presentation of operational and organizational structure.


Read the Article


Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics