TITLE

Nuclear Market�An Extraordinary Opportunity

AUTHOR(S)
Christopher, Thomas
PUB. DATE
May 2002
SOURCE
Nuclear Plant Journal;May/Jun2002, Vol. 20 Issue 3, p46
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Comments on the operation of the nuclear power plant Framatome ANP Inc. in the U.S. Factors that influenced the acquisition of the Duke Engineering & Services; Shortage of skilled outage workers; Excellence in outages.
ACCESSION #
6992475

 

Related Articles

  • First nuclear refueling outage completed in Brazil.  // Power;Sep2002, Vol. 146 Issue 6, p5 

    Reports on the completion of a comprehensive service of Brazilian nuclear power plant, Angra-2 by Framatome ANP. Features of the plant; Maintenance of the plant.

  • Switzerland's Beznau completes digital controls upgrade.  // Power;Aug2002, Vol. 146 Issue 5, p4 

    Reports on the completion of the retrofit of a Teleperm XS system of Beznau's nuclear power station in Switzerland, supplied by Framatome ANP Inc. Comments from Doctor Urs Weidmann, head of the Electrical Department at Beznau; Essential factor to assuring the safe and reliable operation of...

  • CHERNOBYL: the legacy.  // Ecologist;Jun2006, Vol. 36 Issue 5, p013 

    The article reports on the accusations made against Framatome regarding its approach to decommissioning the Chernobyl nuclear power plant. In 1999, Framatome was contracted to build an interim facility to store spent fuel at Chernobyl. Costs on the project have more than tripled and a completion...

  • New Unit in Finland.  // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p16 

    Reports on the proposal submitted to Teollisuuden Vioma Oy (TVO) by Framtome ANP, an AREVA and Siemens company, for the fifth Finnish nuclear power plant. Two reactor types offered by Framatome ANP.

  • Requirement Management for I&C Backfitting. Bock, Heinz-Wilhelm; Wiening, Karl-Heinz // Nuclear Plant Journal;May/Jun2003, Vol. 21 Issue 3, p31 

    Provides information on advanced tool-based procedures for nuclear power plants performed by the engineering staff of the Framatome ANP in Germany for the realization of backfitting instrumentation and control (I&C) systems. TELEPREM XS system platform specification and validation procedure;...

  • New Products, Services & Contracts.  // Nuclear Plant Journal;Jan/Feb2004, Vol. 22 Issue 1, p16 

    Reports on new products, services and contracts in the U.S. nuclear power industry as of January 2004. Victoreen Advanced Survey Meter 990 from Cardinal Health Inc.; Agreement between AREVA with Belgoprocess for design and construction of radioactive waste pretreatment and process facility;...

  • PLUG REDUCES DOWNTIME AT NUCLEAR PLANT.  // Power Engineering;Nov2003, Vol. 107 Issue 11, p158 

    Reports on the repair made at the nuclear power plant of Exelon Corporation in Dresden, Germany, in November 2002, due to an unidentified leakage in the drywell. Removal of the reactor using internal jet pump plugs; Plug designed by Framatome ANP; Test conducted on the flexible mechanical plug.

  • FRAMEATOME ANP WINS NUCLEAR PLANT PRESSURIZER ORDER.  // Worldwide Energy;Aug2004, Vol. 15 Issue 8, p4 

    Reports on the contract awarded to Framatome ANP Inc. to supply a pressurizer to the Saint Lucie Unit 1 nuclear power plant of Florida Power & Light Co. Services covered by the contract; Delivery and installation schedule for the pressurizer; Replacement of the unit's reactor vessel closure...

  • New Products, Services & Contracts.  // Nuclear Plant Journal;Jul/Aug2004, Vol. 22 Issue 4, p14 

    The article presents information on new products, services and business contracts related to the nuclear industry. It is informed that Berkeley Nucleonics Corp. has announced the release of the nukeALERT 951 Early-Warning Radiation Detector, a highly sensitive radiation monitor that discreetly...

Share

Read the Article

Other Topics