TITLE

BMW gives Z3 buyers more time to change order

AUTHOR(S)
Chappell, Lindsay
PUB. DATE
April 2002
SOURCE
Automotive News;4/15/2002, Vol. 76 Issue 5979, p6
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Reports the allowance of time to customers of BMW Manufacturing Corp. during the introduction of its redesigned Z3 automobile in the U.S. Changes in the assembly plant in South Carolina; Delivery time of the vehicles to dealers; Implementation of a customer-oriented sales and production process.
ACCESSION #
6743841

 

Related Articles

  • BMW plans roadster.  // Automotive News;1/11/1999, Vol. 73 Issue 5801, p26 

    Reports on the scheduled production of a roadster based on BMW Manufacturing Corp.'s CO7 concept automobile.

  • Fuel-saving combo. Scott, David; McCosh, Dan // Popular Science;Aug98, Vol. 253 Issue 2, p39 

    Reports on an automobile released by BMW which combines the starter and alternator into a single unit. Mechanism of the vehicle; Evaluation of the vehicle's performance; Benefits of this system.

  • bmw 3 series. Prior, Matthew // Automotive Engineer;Sep98, Vol. 23 Issue 8, p46 

    Features the design of the BMW 3 Series automobile. Physical composition of car; Details of the suspension and engine structure; Weight distribution.

  • Baby, You can Drive My Mini.  // Better Homes & Gardens;Jun2002, Vol. 80 Issue 6, p128 

    Features the Mini Cooper automobile manufactured by BMW Manufacturing company. Price; Car dimensions; Product features.

  • BMW to put $53 million into S.C. plant. Chappell, Lindsay // Automotive News;8/30/1999, Vol. 73 Issue 5835, p32 

    Reports on the investment of BMW Manufacturing Corp. on its Spartanburg County, South Carolina assembly plant for its increasingly complex automobile part production. Sequencing system to handle production parts of the factory; Development of the X5 sport-utility vehicle; Development of a fully...

  • Power without petrol. Dalglish, Geoff // Finance Week;10/20/2000, Pulse. p38 

    Features the automobile BMW 320D by BMW in South Africa. Quality of the car in automatic stability and brake controls; Commendation of the automobile as the first diesel car winning the whole day endurance competition; Differences in the driving technique through its pulling power.

  • BMW prepares its hydrogen-fueled 7 series. Truett, Richard // Automotive News;6/17/2002, Vol. 76 Issue 5987, p6 

    Reports the plan of BMW Manufacturing Corp. to offer hydrogen-fuel internal-combustion engine for the 745H automobile in Germany. Type of fuel to be used for the automobile; Capability of the fuel cell to convert gasoline into hydrogen; Increase in the power of the engine.

  • BMW builds first car at South Carolina plant.  // South Carolina Business Journal;Oct94, Vol. 13 Issue 9, p4 

    Reports on BMW Manufacturing Corp.'s automobile plant in South Carolina. Celebration of first car produced; Schedule of public dedication; Capacity; Plans and expectations.

  • The Mini Is Dead; Long Live the Mini. Hart, Roger // AutoWeek;06/11/2001, Vol. 51 Issue 25, p14 

    Features the Mini Cooper automobile by BMW. Physical description of the car; Engine capacity of Mini Cooper; Safety features of the car; Comparison between the BMW Mini Cooper and the old Mini Cooper.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics