TITLE

Views from the sharp end

AUTHOR(S)
Thisdell, Glenda
PUB. DATE
February 2002
SOURCE
Contract Journal;2/13/2002, Vol. 412 Issue 6364, Special Section p8
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Presents information on rail maintenance contracts in Great Britain. Background on RT1A contracts; Information on the IMC2000 contracts; Decline in the returns under the RT1A contracts.
ACCESSION #
6500834

 

Related Articles

  • In brief.  // International Construction;Mar1998, Vol. 37 Issue 3, p16 

    Reports that Amec of Great Britain has been awarded a railroad track maintenance contract for 10 years in London, England.

  • With fast-track design-build, CSX upgrades line in no time. Powers, Mary Buckner // ENR: Engineering News-Record;08/31/98, Vol. 241 Issue 8, p29 

    Unveils CSX company's upgrade plans along the B&O Railroad corridor between Greenwich, Ohio and Gary, Indiana. Contractor of the project; Maximum price negotiation between CSX and Sverdrup Civil Inc.; Information on the railway signaling system installation; Process needed to keep the...

  • First CTRL maintenance job worth £92m goes to Carillion.  // Contract Journal;9/25/2002, Vol. 415 Issue 6396, p2 

    Reports on the awarding of a maintenance contract for Section 1 of the Channel Tunnel Rail Link (CTRL), a project with Union Railways (South), to Carillion Rail. Cost of the CTRL maintenance project; Duration of the contract; Responsibility of Union Railways under the contract.

  • Uncertain future for rail renewals. Pearman, Ross // Contract Journal;11/12/2003, Vol. 421 Issue 6452, p1 

    Reports on the plan of Network Rail to take some renewal contracts back in-house in Great Britain, as of November 2003. Amount of cost reduction targeted by the rail operator; List of preferred bidders for the construction contracts; Right of maintenance firms that lost their contracts to...

  • Jarvis in contention for south Wales rail scheme. Warner, Brian // Contract Journal;9/8/2004, Vol. 425 Issue 6492, p12 

    Provides information on the rail regeneration project in South Wales as of September 2004. Contenders for the scheme that involves opening up a disused freight line for passenger use; Welsh councils behind the rail regeneration scheme; Scope of the project.

  • GrantRail to fast-track rail line. Warner, Brian // Contract Journal;7/5/2006, Vol. 434 Issue 6582, p9 

    The article reports on a £16 million contract received by GrantRail for the West Coast Main Line project of National Rail aimed at delivering faster railroad journey times between cities in England. The Nuneaton Area Remodelling project includes the reconstruction of railroad tracks and...

  • Saudi operating tenders invited.  // Railway Gazette International;Apr2007, Vol. 163 Issue 4, p184 

    The article announces the deadline for expressions of interest for three major contracts to equip and operate the 2,400 kilometers (km) North-South Railway network in Saudi Arabia. The tendering process is being handled by the Public Investment Fund within the Ministry of Finance. Separate...

  • Gauge enhancement to Elgin goes ahead.  // Rail Business Intelligence;5/25/2006, Issue 270, p3 

    The article reports on a gauge enhancement contract awarded to Jarvis Rail in Great Britain. The £4 million contract involves a work on the route from Mossend yard to Elgin via Aberdeen. Scottish Transport Minister Tavish Scott campaigns to have the loading gauge enhanced to Aberdeen....

  • Marmaray upgrade.  // Railway Gazette International;Dec2011, Vol. 167 Issue 12, p8 

    The article reports that Turkey Transport Ministry issued its CR3 contract to a 70:30 joint venture of Spanish construction company OHL and Invensys Rail. The contract includes provision of signaling and automatic train protection for the Marmaray Project, and the upgrade of suburban lines on...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics