TITLE

TheGREEN FRONTIER

AUTHOR(S)
KENYON, TIM
PUB. DATE
June 2011
SOURCE
Pollution Engineering;Jun2011, Vol. 43 Issue 6, p25
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article focuses on the efforts of the government of North Dakota to clean up the diesel contamination. It states that the city and the North Dakota Department of Health have won around 30 million dollars settlement from the railroad, wherein 24 million dollars of it was appropriated to finish the clean up. Moreover, it notes that two satellite treatment buildings were constructed, which will be used as an additional truck bay after the completion of remediation process.
ACCESSION #
64288164

 

Related Articles

  • Joseph and Gaukel Streets Remediation.  // Canadian Consulting Engineer;Oct/Nov2010, Vol. 51 Issue 6, p37 

    The article focuses on the remediation project in downtown Kitchener, Ontario where a goal gasification plant used to operate. It states that the byproduct of the plant's operation was a coal tar which is considered as hazardous, and the city reportedly decided to remediate the problem when the...

  • Environmental Protection: Funds Obligated for Completed Superfund Projects: RCED-98-232.  // GAO Reports;7/21/1998, p1 

    The Environmental Protection Agency (EPA) relies heavily on contracts and assistance agreements for the Superfund program. Superfund contracts are awarded to private businesses to clean up hazardous waste sites, supervise the cleanups done by others, and provide technical and scientific support....

  • Tribe, State Reach Agreement for Additional Tar Creek Superfund Clean-Up Projects.  // Hazardous Waste/Superfund Alert;6/9/2014, Vol. 36 Issue 11, p6 

    The article discusses additional cleanup activities in the Tar Creek Superfund site in Oklahoma. It discusses the collaboration between the Quapaw Tribe, the Oklahoma Department of Environmental Quality (ODEQ), and Environmental Protection Agency (EPA). The tribe will also be cooperating in the...

  • Modeling Contaminant Transport at the Pore-Micropore Interface. Bagtzoglou, Amvrossios; Kim, Daehyun // Water, Air & Soil Pollution: Focus;Jan2006, Vol. 6 Issue 1/2, p207 

    Understanding and ultimately simulating the contaminant transport processes occurring in, or around, micropore zones is a topic that will help further the advancement of efficient design and implementation of future remediation techniques. This paper proposes a method to forecast effects of...

  • Superfund: Analysis of Costs at Five Superfund Sites: RCED-00-22. Wood, David G. // GAO Reports;1/28/2000, p1 

    Since the Superfund program began in 1980, the Environmental Protection Agency (EPA) has spent about $17.7 billion to clean up hazardous waste sites. EPA oversees the work, but private contractors do the actual cleanups--known as remedial actions--of Superfund sites. GAO has issued a series of...

  • Hazardous Waste: EPA Has Removed Some Barriers to Cleanups: RCED-00-224.  // GAO Reports;8/31/2000, p1 

    The Environmental Protection Agency's (EPA) corrective action program manages the cleanups at operating facilities that pose significant risks to human health or the environment. In 1997, GAO reported that three key requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) were...

  • First Nations still waiting for environmental clean-up. Petten, Cheryl // Ontario Birchbark;Oct2005, Vol. 4 Issue 8, p1 

    This article reports that it has been four decades since the 98 radar sites that made up the Mid-Canada Line were shut down, but First Nations communities west of Hudson and James Bays in Canada are still living with the environmental fall out from the sites on a daily basis. The Mid-Canada...

  • EPA to Review Remediation Activities at Hyde Park, NY Site.  // Hazardous Waste/Superfund Alert;1/10/2011, Vol. 33 Issue 1, p6 

    The article reports that the Environmental Protection Agency in the U.S. is preparing to review the remediation activities at a former industrial and hazardous waste site at Hyde Park, New York. According to the article, the site was polluted by the dumping of industrial liquid wastes and...

  • EPA deems Love Canal cleanup complete. Geiselman, Bruce // Waste News;3/29/2004, Vol. 9 Issue 26, p4 

    The U.S. federal government has completed cleanup work at Love Canal in New York, the toxic site that spawned the creation of the Superfund program, and officials want to remove the site from the program's National Priorities List. The Environmental Protection Agency continues to monitor sites...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics