TITLE

Untitled

PUB. DATE
May 2011
SOURCE
Process Engineering;May/Jun2011, Vol. 92 Issue 3, p44
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports that Kemira Chemicals UK has installed a condensate recovery system from ARI-Armaturen.
ACCESSION #
61022741

 

Related Articles

  • PATENTS.  // Paintindia;May2013, Vol. 63 Issue 5, p121 

    The article offers information on several patents for ink as of May 2013. Kuraray Europe GmbH has applied a patent for printing ink formulations that use polyvinyl isoacetals. These formulations have lower solution viscosity and higher binder. Other patents include polyester surfactants for...

  • Finland pilots waste hydrogen power plant.  // Engineer (Online Edition);6/16/2014, p5 

    The article reports that VTT Technical Research Centre of Finland has developed a pilot-scale power plant based on fuel cells that utilize hydrogen generated as a by-product of a sodium chlorate process at Kemira Chemicals. Topics discussed include the power plant in operation since January 2014...

  • KBA Installs at Gibraltar.  // Paperboard Packaging;Apr2006, Vol. 91 Issue 4, p39 

    The article presents a picture showing Richard Hinrichs, president and chief operating officer of Gibraltar Packaging, talking to first pressperson John Erickson on the installation of the new KBA North America 's Rapida 142 56-inch seven-color press.

  • Just in Time.  // Snack Food & Wholesale Bakery;Jul2008, Vol. 97 Issue 7, p16 

    The article reports that Hill Country Bakery has installed a sophisticated statistical process control (SPC) system in San Antonio, Texas.

  • Giants make dam sure.  // WET News: Water & Effluent Treatment News;Nov2011, Vol. 17 Issue 11, p1 

    The article reports on the installation of two giant Hydro-Brake Flow Control devices into the dam constructed by Gallliford Try on the River Douglas near Wigan town in England.

  • Method For Hot-Tap Connections Capable Of Saving Millions.  // Pipeline & Gas Journal;Nov2001, Vol. 228 Issue 11, p32 

    Focuses on the onshore development of Grouted Tee connection for pipelines in Great Britain. Conformation of the Grouted Tee with IGE/TD/1 Edition 3: Institution of Gas Engineers; Provision of guidance on loading conditions; Challenges associated with Grouted Tee installation.

  • Ask Donna. Ballast, Donna // Cabling Installation & Maintenance;May98, Vol. 6 Issue 6, p10 

    Presents answers to questions about cabling installation. Difference between a crossconnect and an interconnect; Effectiveness of copper in comparison to optical-fiber connector.

  • West Virginia contractors adapt to adverse conditions.  // Pipeline & Gas Journal;Jan97, Vol. 224 Issue 1, p26 

    Focuses on the time- and cost-saving benefits of pipe ramming using Vermeer Hammerhead Mole to help utility contractors install pipe in different terrain in West Virginia. Effectiveness of pipe ramming with pneumatic tools used for gas installation jobs; Comparison of pipe ramming with the...

  • Firth turbine lease agreed.  // Planning (14672073);11/5/2010, Issue 1893, p5 

    The article reports on the installation of 400 underwater turbines at the Pentland Firth in Scotland.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics