TITLE

Infrastructure upgrades total €4.2bn

PUB. DATE
April 2011
SOURCE
Railway Gazette International;Apr2011, Vol. 167 Issue 4, p16
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the plan of Deutsche Bahn to spend 4.2 billion euros to modernize existing infrastructure in 2011 replacing 1600 turnouts, 4000 kilometer of rail, two million sleepers, and 2.5 million tonnes of ballast.
ACCESSION #
60172862

 

Related Articles

  • Deutsche Bahn to review ad account.  // Adweek Western Edition;6/12/95, Vol. 45 Issue 24, p20 

    Reports on Deutsche Bahn AG's plans to review its advertising account. Contenders for the account.

  • German Channel Tunnel trains delayed. Caswell, Mark // Business Traveller (UK/Europe Edition);Feb2012, p8 

    The article reports on the launch of international rail services from London, England by German national railway company Deutsche Bahn in 2015.

  • German Rail.  // Railway Age;Jan96, Vol. 197 Issue 1, p68 

    Reports that German Rail will invest $54 billion in capital improvements up to the year 2000. $35 billion for infrastructure; $13 billion for new and rebuilt rolling stock; $5.25 billion for maintenance equipment and data processing.

  • New sleepers for Hamburg.  // International Construction;Jun98, Vol. 37 Issue 6, p89 

    Introduces Deutsche Bahn's high-strength sleepers manufactured by using concrete block and steel tie-bars of polymer concrete. Advantage of the sleepers' high electrical resistance; Manufacturing process.

  • Death row for DR diesels.  // Railways Illustrated;Mar2012, Vol. 10 Issue 3, p47 

    The article reports that Deutsche Bahn AG (DB) is withdrawing several of its big ex-DR diesels engines.

  • DBS plates to be sold by Lewis. Watts, Andrew // Railways Illustrated;Jun2015, Vol. 13 Issue 6, p86 

    The article offers information on the railwayana auction to be held by David Lewis at Crewe Heritage Railway Centre on April 25, 2015, which will involve nameplates to be sold on behalf of DB Schenker, rail company.

  • Germany invests $2.6 billion in new rolling stock.  // Railway Age;Jan95, Vol. 196 Issue 1, p68 

    Reports that German Rail has placed $2.6 billion worth of orders for new equipment. List of equipment suppliers chosen by German Rail.

  • ETCS failure.  // Railway Gazette International;Oct2012, Vol. 168 Issue 10, p64 

    The article reports that the previous diversion of Frankfurt, Germany-Brusells, Belgium railway service by Deutsche Bahn (DB) operators is said to be attributed to technical European Train Control System (ETCS) defect.

  • German shunters arrive at Eastleigh Works.  // Railways Illustrated;Jan2012, Vol. 10 Issue 1, p44 

    The article reports that two former Deutsche Bahn Class 323 4wDH Kof locomotives have arrived at Eastleigh Works in England for refurbishment.

  • CARTEL OFFICE INVESTIGATING DB TICKET SALES. Fender, Keith // Modern Railways;Apr2014, Vol. 71 Issue 787, p84 

    The article offers information on the announcement made by the German Cartel Office (Bundeskartellamt) related to investigation of Deutsche Bahn, German railway company, ticket sales within Germany.

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics