Labor and Material Required for College Housing

Miller, Stanley F.
September 1965
Monthly Labor Review;Sep65, Vol. 88 Issue 9, p1100
Academic Journal
Deals with cost of constructing college housing projects in the United States. Number of hours required for manufacture of materials and various other off-site activities; Analysis of data obtained for a survey by the U.S. Bureau of Labor Statistics; Project characteristics; On-site labor requirements; Materials used.


Related Articles

  • Construction by region.  // Business News New Jersey;12/27/95, Vol. 8 Issue 24, p8 

    Focuses on the rise in cost of nonresidential construction across the region. Statistics; Decrease of each region; Southern New Jersey better than central or northern New Jersey.

  • Costs rising for bypass. Illia, Tony // Las Vegas Business Press;5/27/2002, Vol. 19 Issue 21, p3 

    Reports the increasing construction costs for the Hoover Dam Bridge along the Arizona/Nevada border. Failure of field engineering work to validate the assumptions of programmatic estimate; Difficulty of bridge erection with the restricted site access; Call for additional funding in part of...

  • Fortune cookie wisdom for the self-employed. Weingarten, Larry; Weingarten, Susanne // Plumbing & Mechanical;Aug95, Vol. 12 Issue 6, p98 

    Discusses ways of controlling expenditures in the construction industry. Includes downsizing; Advertising expenses; Specialization.

  • Biopharmaceutical construction, costs, and cost controls. Law, Christopher // Cost Engineering;Sep97, Vol. 39 Issue 9, p37 

    Describes the costs and cost control methodology used in a biopharmaceutical construction project in Pennsylvania. Time period of the project construction; Project history; Contractual administration and cash-flow management; Project cost.

  • The human factor versus the computer factor. Altayeb, Saleh A. // Cost Engineering;Nov97, Vol. 39 Issue 11, p15 

    Focuses on cost estimators in the construction field. Responsibilities of cost estimator; Familiarity of estimator with construction materials; Ability of estimator to read drawings and specifications; Familiarity of estimator with labor costs; Ability of making enlightened decisions among...

  • The 2008 Editorial Calendar.  // Cost Engineering;Apr2008, Vol. 50 Issue 4, p33 

    A calendar of themes for each issue of "Cost Engineering" for 2008 is presented which includes Building Information Modeling, Claims and Dispute Resolution and Government Public Works.

  • Design phase cost control. Young III, James A. // AACE International Transactions;1997, pCC.01 

    Focuses on the use of design phase cost control scheme in the construction industry. Scope control and parametric estimates; Preconstruction budgeting; Ability to influence final cost over project life; Contractor validation and contingency control.

  • Inter-American construction costs. Varela, Leopoldo G.; Grant, Roger J. // AACE International Transactions;1997, following pINT.0 

    Focuses on the information needs on construction costs of construction companies from North America who are considering investing in South America. Development of an inter-American construction cost information system; Macroeconomic variables; Real labor cost comparison; Americas per capita income.

  • Cost estimating challenges facing Eastern Europe. Selg, Richard A. // AACE International Transactions;1997, following pINT.0 

    Focuses on construction industry cost estimating concerns facing Eastern Europe. Closed-market to open-market conditions; Total cost management resolutions; Simulation of internal and external factors.


Read the Article


Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics