TITLE

30-year master plan

PUB. DATE
March 2011
SOURCE
Railway Gazette International;Mar2011, Vol. 167 Issue 3, p11
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports that on January 19, 2011, the Saudi Railways Organization (SRO) created a 30-year-plan to improve the country's railway service, setting aside 5.2 million riyals to create two routes between the capital at Riyadh and the port of Dammam, which will be built by the Fayez Žuhair, the German Gesellschaft für Internationale Zusammenarbeit (GTZ), and Dornier.
ACCESSION #
59413126

 

Related Articles

  • Saudi high-speed job for Invensys.  // Modern Railways;Dec2011, Vol. 68 Issue 759, p92 

    The article reports that the contract for superstructure, systems, rolling stock, signalling, operation and maintenance for the Haramain high Speed Line in Saudi Arabia has been given to the Saudi Railways Organization (SRO).

  • East-west link.  // International Construction;Nov2011, Vol. 50 Issue 9, p8 

    The article reports on the plan approved by the Saudi Railways Organisation for a new 950-kilometer rail line to connect the western port of Jeddah and Dammam and Jubail on the east coast.

  • Saudi Arabia : CHAIRMAN OF SAUDI RAILWAYS inks contract for Dammam-Riyadh rail freight line.  // TendersInfo News;8/12/2014, p1 

    The article reports that the chairman of Mu'assasah al-Ammah lil-Khutut al-Hadidiyah al-Saudiyah (Saudi Railways), Mohamed Swaiket has signed a contract to double track a section of Dammam-Riyadh rail freight line in Saudi Arabia.

  • Riyadh prepares tenders for Mecca-Medina rail link.  // MEED: Middle East Economic Digest;6/12/2009, Vol. 53 Issue 24, p16 

    The article reports that the Saudi Railways Organisation (SRO) is seeking to develop the $6 billion Haramain high-speed rail project between Mecca and Medina in Saudi Arabia with the start of the second round of bidding by June 2009 end. Invitations to bid on the second phase of package one is...

  • Riyadh delays Haramain rail award until mid-July. FENTON, SUZANNE // MEED: Middle East Economic Digest;4/8/2011, Vol. 55 Issue 14, p17 

    The article reports on the 7 billion dollars Haramain highspeed railway project of Saudi Arabia in which the Saudi Railways Organisation (SRO) has delayed the awarding of construction contract for phase two by three months.

  • Saudi train on test.  // Railway Gazette International;Sep2011, Vol. 167 Issue 9, p11 

    The article reports that the first of eight fixed-formation trainsets ordered from CAF by Saudi Railways Organisation in July 2008 is undergoing trials at the VUZ test centre at Velim in the Czech Republic.

  • Intrusion detection.  // Railway Gazette International;Dec2014, Vol. 170 Issue 12, p18 

    The article reports that OptaSense, a QinetiQ subsidiary, and local partner Abdulla Fouad Holding Co. received a 12 millionu U.S. dollar contract from Saudi Railways Organization, which will see it installing and maintaining a 1,000 kilometer optic fibre intrusion detection system on the...

  • CAF wins order.  // Railway Gazette International;Aug2008, Vol. 164 Issue 8, p472 

    The article announces the contract signed by Spanish rolling stock manufacturer CAF with Saudi Railways Organisation to supply it with eight 200 kilometers per hour (km/h) passenger trainsets. Each set will be formed of a diesel-electric locomotive and five steelbodied coaches, designed to...

  • POINTERS.  // Railway Gazette International;Mar2012, Vol. 168 Issue 3, p32 

    This section presented updates related to the railroad industry. Russia's Ministry of Transport proposed that freight operators should have a minimum fleet of 1,000 wagons in order to use the RZD network. Saudi Railways Organisation will call tenders for work on the Saudi Landbridge. Indian...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics