Critical Path Analysis in the Fuzzy Project Network

AUTHOR(S)
Shankar, N. Ravi; Sireesha, V.; Rao, P. Phani Bushan
PUB. DATE
November 2010
SOURCE
Advances in Fuzzy Mathematics;2010, Vol. 5 Issue 3, p285
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
This paper presents a method for finding critical path in the fuzzy project network. Trapezoidal fuzzy numbers are used to represent activity times in the project network. We also apply two ranking procedures on fuzzy numbers one using individual ranking of fuzzy numbers and other using set of fuzzy numbers to proposed critical path method. Comparison reveals that the ranking of fuzzy numbers using set of fuzzy numbers is better compare to the individual ranking of fuzzy numbers in finding critical path of a project network.
ACCESSION #
57669257

 

Related Articles

  • A new method for critical path method with fuzzy processing time. Pour, N. Shahsavari; Kheranmand, M.; Fallah, M.; Zeynali, S. // Management Science Letters;2011, Vol. 1 Issue 3, p347 

    Critical path method plays an important role on managing medium to large-scale problems. It is often difficult to determine the critical path for different reasons such as the existing uncertainties in processing tasks. One alternative to handle the uncertainty associated with the processing...

  • An order acceptance using FAHP and TOPSIS methods: A case study of Iranian vehicle belt production industry. Parsaei, Saeid; Keramati, Mohammad Ali; Zorriassatine, Farbod; Feylizadeh, Mohammad Reza // International Journal of Industrial Engineering Computations;Jan2012, Vol. 3 Issue 2, p211 

    Decisions related to acceptance or rejection of orders play an important role in companies engaged in make-to-order production. The incoming orders have a specific delivery date by which the customer expects the due date to be met and the order delivered. In some cases the level of input orders...

  • An Improved Ranking Method for Fuzzy Numbers Using Left and Right Indices. Luu Quoc Dat; Yu, Vincent F.; Shuo-Yan Chou // International Proceedings of Computer Science & Information Tech;2012, Vol. 49, p89 

    Although many different methods for ranking fuzzy numbers have been proposed in the last few decades, there lack efficient methods that are applicable to a wide variety of situations. Some of the existing methods even have shortcomings or difficulty in calculation. This paper proposes a novel...

  • Some Arithmetic Aggregation Operators with Intuitionistic Trapezoidal Fuzzy Numbers and Their Application to Group Decision Making. Guiwu Wei // Journal of Computers;Mar2010, Vol. 5 Issue 3, p345 

    Methods for aggregating intuitionistic trapezoidal fuzzy information are investigated. Some operational laws of intuitionistic trapezoidal fuzzy numbers are introduced. Based on these operational laws, some aggregation operators, including intuitionistic trapezoidal fuzzy ordered weighted...

  • An Approach to Evaluating the Network Marketing Performance with Fuzzy Number Intuitionistic Fuzzy Information. Guoqing Wu // International Journal of Digital Content Technology & its Applic;Jul2012, Vol. 6 Issue 13, p557 

    In this paper, we investigate the multiple attribute decision making (MADM) problems for evaluating the network marketing performance with fuzzy number intuitionistic fuzzy information. We utilize the fuzzy number intuitionistic fuzzy weighted geometric (FIFWG) operator to aggregate the fuzzy...

  • Deriving Fuzzy Inequalities Using Discrete Approximation of Fuzzy Numbers. Khademi, N.; Bahaabadi, M. Rajabi; Mohaymany, A. Shariat; Shahi, J. // International Journal of Engineering Science (2008-4870);Sep2013, Vol. 24 Issue 3, p207 

    Relative comparison of fuzzy numbers plays an important role in the domain of the fuzzy multi-criteria and multi-attribute decision making analysis. For making a comparison between two fuzzy numbers, beyond the determination of their order, the concept of inequality is no longer crisp. That is,...

  • Decision-Making Model for Multidimensional Analysis of Preference Based on Intuitionistic Trapezium Fuzzy Set. Yuxun Liu // Journal of Convergence Information Technology;Jan2013, Vol. 8 Issue 1, p169 

    Decision-making model for multidimensional analysis of preference on trapezoid fuzzy number distant expected values are proposed. The group decision-making problem are solved when preference and attribute are given by trapezoid fuzzy number. Its algorithm is as follows: First, define a...

  • Application of Fuzzy Topsis Method for Solving Job-Shop Scheduling Problem. Jadhav, V. S.; Bajaj, V. H. // International Journal of Operational Research & Optimization;Jul2011, Vol. 2 Issue 2, p333 

    In this paper, we focused on the scheduling and sequencing which is a form of Decision Making (DM) that plays a crucial role in production manufacturing and service industries. Job- scheduling problem arise when there is a choice as to the order in which number of tasks can be performed. In such...

  • Fuzzy model tuning based on a training set with fuzzy model output values. S. Shtovba // Cybernetics & Systems Analysis;May2007, Vol. 43 Issue 3, p334 

    Abstract  The paper considers the training of a fuzzy model with the help of a training set with fuzzy model output values. Two ways are proposed for constructing fuzzy rule-based multifactor models that produce fuzzy numbers at their outputs. The problem of tuning such fuzzy models on the...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics