TITLE

Ilmenau: Neue Hauptbibliothek der Universitätsbibliothek eröffnet

AUTHOR(S)
Vogt, Gerhard
PUB. DATE
July 2010
SOURCE
Bibliotheksdienst;2010, Vol. 44 Issue 7, p730
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
This article reports on the opening of the Principle Library of the Ilmenau University Library on April 7, 2010. The project, which created 7286 square meters of library space, took two years of planning and three years of construction to finish. During this time the library had to move to a different building for several months, and had to shut down completely for several days in April 2010. In 2011 they will be working a science department, called the Curie Library, and their own newspaper.
ACCESSION #
54021930

 

Related Articles

  • OVERDUE! Lerner, Jonathan // Metropolis: Architecture Design;Feb2009, Vol. 28 Issue 7, p26 

    The article discusses issues surrounding the construction of a central library in Atlanta, Georgia. City administrators hope to build a public library facility that would reflect Atlanta's active, impressive and exceptional lifestyle. A dilemma, however, arose as the choices have narrowed down...

  • £50m commission to transform Liverpool library.  // Building Design;11/6/2009, Issue 1891, p3 

    The article reports that conservation architect William Anelay was commissioned to design the new Liverpool Central Library and Archive, which is worth 50 million pounds and part of the Inspire Partnership. It states that portions of the original Central Library such as the Hornby and Oak...

  • Book smart.  // Building Design;8/30/2013, Issue 2074, p20 

    The article offers information on the Redditch Central Library, designed by John Madin Design Group and located in Redditch, England.

  • Snøhetta and DIALOG selected to design new Central Library in Calgary.  // Canadian Architect;Feb2014, Vol. 59 Issue 2, p09 

    The article announces that architectural firms Snøhetta and DIALOG have been chosen to design the Central Library in Calgary, Canada.

  • Library Rehab Project Follows OSHA Playbook.  // ENR: Engineering News-Record;11/18/2013, Vol. 272 Issue 10, pMW15 

    The article features the St. Louis Central Library in Missouri, winner of the Best Safety Project and Best Renovation/Restoration Project awards for 2013. The renovation of 100-year-old library included full restoration of its Great Hall, foyer and historic rooms. The safety program for the...

  • Building on experience. Raven, Debby // Information Scotland;Dec2007, Vol. 5 Issue 6, p3 

    The article introduces a series of articles related to library buildings and design.

  • Award of merit Cultural/Worship Submitted by Turner Construction Co. Southern California.  // ENR: Engineering News-Record;12/1/2014 City Scoop, pCA18 

    The article looks at the reconstruction work done at the San Diego Central Library located in San Diego, California and mentions that the reconstruction was done by Turner Construction Co.

  • Tall tale.  // American Cranes & Transport;Sep2012, Vol. 8 Issue 9, p45 

    The article focuses on the construction of the $185 million San Diego, California Central Library being built by Turner Construction Co. with the use of Building Information Modeling process.

  • A Catalyst for Creativity. Greenwalt, Toby // Library Journal;9/15/2015 Supplement, p11 

    The article evaluates the architectural design of the Madison Central Library in Madison, Wisconsin that was designed by architectural firm MSR.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics