TITLE

Heil Environmental begins plant expansion

PUB. DATE
August 2010
SOURCE
Trailer / Body Builders;Aug2010, Vol. 51 Issue 10, p13
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the 6.4 million U.S. dollar expansion of the manufacturing facility of Heil Environmental in Fort Payne, Alabama which is expected to be completed before the end of 2010.
ACCESSION #
53457336

 

Related Articles

  • Hoist built for tight spaces.  // Resource Recycling;Sep2011, Vol. 30 Issue 9, p59 

    The article offers brief information on the LowLift cable hoist from Heil Environmental Inc.

  • Hell Environmental.  // Resource Recycling;Aug2010, Vol. 29 Issue 8, p44 

    The article reports that Heil Environmental, a manufacturer of recycling vehicles will expand its production capacity in its facility in Fort Payne, Alabama, and its cycle time will improve by 95 percent.

  • Hoist meant to make loading and unloading easy.  // Resource Recycling;May2012, Vol. 31 Issue 5, p52 

    The article offers brief information of the KwikLift cable hoist from Heil Environmental.

  • DuaLift designed for safety and speed.  // Resource Recycling;Dec2011, Vol. 30 Issue 12, p44 

    The article evaluates the DuaLift from Heil Environmental Inc.

  • Heil Increases Prices 5%.  // Trailer/Body Builders Exclusive Insight;1/7/2013, p2 

    The article reports on the average 5% price increase on all refuse collection bodies and roll-off hoists announced by Heil Environmental, effective January 1, 2013.

  • HEIL ENVIRONMENTAL.  // MSW Management;Oct2009, Vol. 19 Issue 7, p55 

    The article evaluates the Multitask SL drop-frame side loader from Heil Environmental.

  • Drop frame side loader.  // Commercial Carrier Journal;May2009, Vol. 166 Issue 5, p62 

    The article evaluates the MultiTask SL drop flame side loader from Heil.

  • Hell upgrades Half/Pack front loaders.  // Fleet Equipment;Sep2008, Vol. 34 Issue 9, p56 

    The article evaluates the vane pump from Heil Environmental.

  • SUPPLIER NEWS.  // Waste & Recycling News;7/5/2010, Vol. 16 Issue 5, p26 

    The article discusses the expansion of manufacturing plant at Heil Environmental in Fort Payne, Alabama. The project costs 6.4 million dollar and includes process and equipment improvements. It reports that the plant expansion project is scheduled to be completed before the end of 2010. The...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics