TITLE

Untitled

PUB. DATE
July 2010
SOURCE
Process Engineering;Jul/Aug2010, Vol. 91 Issue 4, p52
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the three-year frame agreement signed by ABB for the delivery and maintenance of telecommunications systems for Statoil offshore installations.
ACCESSION #
53292387

 

Related Articles

  • Timing is everything. Lesea, Austin // Telecom Asia;Nov96, Vol. 7 Issue 11, p30 

    Discusses the importance of timing and synchronization in servicing and maintaining telecommunication networks. Scheduling of network timing with the Stratum 1 tracking input; Extensiveness of using the building integrated timing system (BITS) concept in synchronizing networks;...

  • AH-64...  // PS: Preventive Maintenance Monthly;Jun98, Issue 547, p43 

    Presents tips on how to a isolate a shorted circuit in the communications wiring of an Apache helmet. How to look for the damaged part of the communication wiring.

  • Heat: the invisible destroyer. Amenrud, Toni; Mordick, Brian // Communications News;Apr2002, Vol. 39 Issue 4, p14 

    Focuses on the prevention of excessive heat buildup in networking equipment. Damage caused by excessive heat buildup; Problems with lowering the temperature in the room that contains the equipment; Discussion on several cabinet configurations to consider to prevent excessive heat buildup.

  • Calendar of events.  // Cabling Installation & Maintenance;Mar1996, Vol. 4 Issue 4, p79 

    Presents upcoming events in March to May 1996 which are of interest to individuals in the telecommunication industry especially those who are involved in cabling installation and maintenance.

  • Service that merits a tip of the (hi-) cap. Clawson, Charles // America's Network;3/1/94, Vol. 98 Issue 5, p98 

    Features the installation and maintenance of high-capacity transmission facilities by local exchange carriers (LEC) in the United States. Competition with fiber optic systems; Service conditions of copper facilities; Reorganization of the Pacific Bell in Sacramento, California organization;...

  • DON'T FIGHT THE FUTURE. Chandler, Nikki // Mobile Radio Technology;Nov2000, Vol. 18 Issue 11, p28 

    Focuses on the evolution of test equipment for the installation and maintenance of communication systems. Developments in the appearance of test equipments; Improvements in the ergonomics of equipments; Direction toward hands-free communications; Digitally-controlled adjustments in radios;...

  • One day in PARAD-ICE. McElligott, Tim // Telephony;02/12/2001, Vol. 240 Issue 7, p62 

    Offers a look at the job of some customer systems technicians of Ameritech. Steps involved in shooting service troubles in telephone systems; Problems in taking customer complaints; Description of some repair cases handled by the technicians.

  • Sound the alarm. Beutmueller; Wurzinger, Andrew A. // Wireless Review;12/01/99, Vol. 16 Issue 24, p28 

    Discusses the essentials of effective telecommunication network-maintenance solutions. Support for multivendor networks and network equipment; Capabilities of fault management; Design of alarm-response workflows.

  • DON'T BE CAUGHT UNAWARE.  // PS: Preventive Maintenance Monthly;Aug2005, Issue 633, preceding p1 

    Focuses on the importance of timely preventive maintenance for the communication system used by soldiers. Use some compressed air for removing dust from the equipment; Cardinal rule of preventive maintenance; Contributing factor to the loss of situational awareness.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics