TITLE

Going nowhere slowly

PUB. DATE
July 2010
SOURCE
Railway Gazette International;Jul2010, Vol. 166 Issue 7, p25
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the decision of the federal government in Argentina to extend the bidding timetable for a project that would introduce high performance passenger services between Mendoza and Buenos Aires on June 8, 2010, wherein the deadline for financial and technical bids was moved to December 14, 2010.
ACCESSION #
52412382

 

Related Articles

  • The vanishing tracks of time. Garcia, Gabriel; Lowe, Jason // Americas;Sep/Oct92, Vol. 44 Issue 5, p6 

    Introduces readers to the old-fashioned train called El Trochita, a steam engine that puffs through Patagonia, located at the southernmost tip of the Americas, which serves as a lifeline for rural communities overlooked by modern progress. Wood-burning stoves that keep passengers warm; The...

  • Keeping La Trochita on track. Goodman, Joshua // Christian Science Monitor;3/28/2001, Vol. 93 Issue 85, p16 

    Discusses the Viejo Expreso Patagonico, or the Old Patagonian Express, train in Argentina.

  • Last two concessions start up.  // Traffic World;7/26/93, Vol. 235 Issue 4, p32 

    Reports on the operation of rail freight concessions in Argentina granted by the government. Railroad Development Corp.'s operation; Buenos Aires al Pacifico S.A.'s operation.

  • U.S. group wins second Argentine contract.  // Railway Age;Mar93, Vol. 194 Issue 3, p13 

    Announces Argentina's awarding of 30-year concession contract to consortium including Railway Development Corp. (RDC) as operator and Conrail as technical consultant. Urquiza Railway line management 100 percent Argentine; Key resources from the United States.

  • Double-deck in BA.  // Railway Gazette International;Jan2011, Vol. 167 Issue 1, p18 

    The article reports that three air-conditioned double-deck rail coaches built in Argentina by Emfer have been brought into service by suburban concessionaire TBA.

  • North and south.  // Railway Gazette International;Mar2012, Vol. 168 Issue 3, p18 

    The article reports on the groundbreaking for the extensions of Buenos Aires metro Line H in Argentina on January 17, 2012.

  • Sarmiento works underway.  // Railway Gazette International;Aug2012, Vol. 168 Issue 8, p10 

    The article reports that a railroads project was officially launched in Buenos Aires, Argentina, which Minister of the Interior & Transport Florencio Randazzo described as the most important railway project of the last 100 years.

  • Sealed Bids Invited. The TFMG Bond Research Group // Bond Buyer;2/26/2002, Vol. 339 Issue 31332, p32 

    Presents information pertaining to sealed bids invited in the U.S. as of February 26, 2002.

  • Learning from DSM's first-generation bid results. Bretz, Elizabeth A. // Electrical World;Sep94, Vol. 208 Issue 9, p37 

    Offers a look at the demand-side management (DSM) bidding programs. Demand reductions; Competition; Proposals; Levelizes total resource costs. INSET: Virginia Power tests the DSM bidding waters..

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics