TITLE

Drone tampers set to work

PUB. DATE
June 2010
SOURCE
Railway Gazette International;Jun2010, Vol. 166 Issue 6, p26
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on orders received by Harsco Rail with a total value of six million U.S. dollars for the production and delivery of its Drone Tamper.
ACCESSION #
51539021

 

Related Articles

  • ANALYSIS: IN BRIEF.  // Rail Business Intelligence;5/26/2011, Issue 390, p9 

    The article offers news briefs related to railway industry of Great Britain including new entrance opened to Clapham Junction station in London, England, Amey Rail Ltd. awarded with a contract worth 6.48 million pounds by Network Rail Ltd. and the company Harsco Rail, which has been awarded a...

  • Track Construction Machine helping double track NHHS rail line.  // Railway Track & Structures;Nov2016, Vol. 112 Issue 11, p4 

    The article reports on the railroad track construction in the parts of the New Haven-Hartford Springfield (NHHS) passenger line in Connecticut has been doubled by the Track Construction Machine (TCM). It states that the TCM made by supplier of railway track maintenance and construction equipment...

  • Worldwide.  // Railway Age;May2010, Vol. 211 Issue 5, p8 

    The article reports on the ballast tamper ordered by Brazilian contractor, EGESA Engenharia SA from Harsco Rail and the approval of the automatic train control system of Bombardier Transportation by the Spanish National Railways.

  • A machine for all seasons.  // Railway Gazette International;Feb2013, Vol. 169 Issue 2, p22 

    The article offers information on an upgraded Spreader-Ditcher machine from Harsco Rail.

  • TIE AND SWITCH TAMPING. Wanek.-Libman, Mischa // Railway Age;Jul2012, Vol. 213 Issue 7, p31 

    The article offers information on tamping machines including the 09-3X-CW Dynamic Tamping Express machine, and the 09-4X Dynamic Tamping Express machine from Plasser American Corp., and the DRONE Chase Tamper from Harsco Rail.

  • Pushing the productivity envelope. Judge, Tom // Railway Age;Aug2010, Vol. 211 Issue 8, p27 

    The article reports on the initiatives of maintenance-of-way suppliers in the railroad industry to make the most of available track time, balancing the quest to operate a fluid railroad with that of squeezing maximum productivity. It presents examples of where progress in speed and accuracy is...

  • SPECIAL CARE AROUND SPECIAL TRACKWORK. WANEK-LIBMAN, MISCHA // Railway Age;Oct2016, Vol. 217 Issue 10, p21 

    The article offers information on tamper units from various rail maintenance provider including the Unimat series from Plasser American Corp., the DRONE Chase Tamper from Harsco Rail, and RoadReady Surfacing Team tamper unit line from Nordco Inc.

  • INFRASTRUCTURE.  // Railway Gazette International;May2010, Vol. 166 Issue 5, p20 

    This section offers news briefs on the railway sector. A laser-guided tamping machine from Harsco Rail will be supplied to EGESA Engenharia. IPR Slovakia has been selected as the lead contractor for an upgrade of the main station of Bratislava, Slovakia. A contract worth 42.3 million euros has...

  • Just say when. Vantuono, William C. // Railway Age;Sep2000, Vol. 201 Issue 9, p81 

    Considers the views of several railroad executives regarding time-value shipments in the railroad market. Definition of time-value; Examples of time-value shipments; What could be done to prevent bad shipments.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics