TITLE

BABs Take Texas Tollway on New Path

AUTHOR(S)
Williamson, Richard; McGee, Patrick
PUB. DATE
March 2010
SOURCE
Bond Buyer;3/17/2010, Vol. 371 Issue 33283, p1
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the significance of an innovative approach to finance the 183A Toll Road Extension of Central Texas Regional Mobility Authority in Dallas.
ACCESSION #
48897607

 

Related Articles

  • CALIFORNIA: HOT Lanes in Riverside. Saskal, Rich // Bond Buyer;6/20/2008, Vol. 364 Issue 32904, p9 

    The article reports that California has drafted the Senate Bill 1316 (SB 1316) to facilitate the creation of high-occupancy toll lanes on the State Route 91 freeway in Riverside County. The bill allows the Riverside County Transportation Commission to build high-occupancy toll lanes on its...

  • Ruling Gives Green Light to North Carolina Toll Road. SIGO, SHELLY // Bond Buyer;10/26/2011, Vol. 378 Issue 33605, p3 

    The article reports on the continuation for the 19.7-mile Monroe Connector toll road by the North Carolina Turnpike Authority (NCTA) following the rejection of the U.S. District Court Judge James Dever on the suit filed that stalled the project. It says that the next step for the project will...

  • N12 EXPANSION: BUILDING A NEW SUPERCLASS HIGHWAY.  // Civil Engineering (10212000);Jan2012, Vol. 20 Issue 1, p56 

    The article reports on the construction of toll route system National Route 12 (N12) under the Gauteng Freeway Improvement Project (GIFP) in South Africa.

  • E-470 stuck in legal bog. Korman, Richard // ENR: Engineering News-Record;1/31/94, Vol. 232 Issue 5, p36 

    Reports on the stats of construction of the E-470 beltway in Denver, Colorado. Litigation due to project realignment; Lack of long-term financing; Pending decision from the state Supreme Court.

  • Early finish possible at Dulles extension.  // ENR: Engineering News-Record;9/12/94, Vol. 233 Issue 11, p22 

    Reports on the construction of the 14-mile-long toll road extension in Virginia. Extension of an existing toll road from the Washington, D.C. Beltway to Dulles-Washington International Airport; Value of the overall construction contract; Brown & Root as the major contractor; Predictions of...

  • Toll Road Update.  // Bulverde Standard (Canyon Lake, TX);10/3/2007, Vol. 23 Issue 40, p14 

    The article reports that the Alamo Regional Mobility Authority Board of Directors has authorized the release of a design build request for qualification for the 281 North toll project in San Antonio, Texas.

  • PRESIDENT GEORGE BUSH TURNPIKE, WESTERN EXTENSION.  // Roads & Bridges;Oct2012, Vol. 50 Issue 10, p28 

    The article highlights the President George Bush Turnpike-Western Extension found in Grand Prairie Texas and commissioned by the North Texas Tollway Authority with a total cost of 416 million U.S. dollars.

  • Loop 9 revived.  // Ellis County Press;5/9/2013, Vol. 22 Issue 5, p3 

    The article offers the author's view on revived discussions on the construction of the proposed Loop 9 toll road in Texas.

  • Prelim work begins on SH 45, north of Hays. Biundo, Jen // Hays Free Press (Buda, TX);7/11/2007, Vol. 104 Issue 14, p1A 

    The article reports that contractors for the Texas Department of Transportation will start the construction on State Highway 45 Southeast, a seven-mile toll road that will connect IH-25 with state highway 130 at Highway 183.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics