TITLE

Actions Needed to Better Prepare to Recover from Possible Attacks Using Radiological or Nuclear Materials

AUTHOR(S)
Alotse, Gene
PUB. DATE
February 2010
SOURCE
GAO Reports;2/26/2010, preceding p1
SOURCE TYPE
Government Document
DOC. TYPE
Article
ABSTRACT
The article presents a study conducted by the U.S. Accountability Office (GAO) which determines the plans of the federal government in helping cities and states clean up contaminated areas from radiological dispersal device (RDD) or improvised nuclear device (IND) incidents. It explores the capability of the government in effectively cleaning up contaminated areas. It presents suggestions in improving federal preparedness to help cities and states recover from such incidents.
ACCESSION #
48809351

 

Related Articles

  • $60,000 Per Day.  // Nuclear Waste News;2/14/2013, Vol. 33 Issue 3, p6 

    The article informs that the U.S. federal government will pay a penalty of U.S. dollars 60,000 a day in case of its failure to clean up radioactive waste in Idaho by 2035 and it also discusses six-point plan proposed by the Idaho's gubernatorial commission regarding nuclear issue.

  • Uncertainties and Questions about Costs and Risks Persist with DOE's Tank Waste Cleanup Strategy at Hanford. Aloise, Gene // GAO Reports;9/30/2009, preceding p1 

    The article offers information on the September 2009 issue of "Nuclear Waste: Uncertainties and Questions About Costs and Risks Persist With DOE's Tank Waste Cleanup Strategy at Hanford." It explores the assessment conducted by the Government Accountability Office (GAO) on tank waste cleanup...

  • Nuclear Waste Cleanup: DOE Has Made Some Progress in Cleaning Up the Paducah Site, but Challenges Remain: GAO-04-457. Nazzaro, Robin M. // GAO Reports;4/1/2004, p1 

    In 1988, radioactive contamination was found in the drinking water wells of residences near the federal government's uranium enrichment plant in Paducah, Kentucky. In response, the Department of Energy (DOE) began a cleanup program. In 2000, GAO reported that DOE faced significant challenges in...

  • GAO auditing uranium cleanup. LEE BITSOI, ALASTAIR // Navajo Times;7/25/2013, Vol. 52 Issue 30, pA-5 

    The article focuses on auditing by the U.S. Government Accountability Office (GAO) of radioactive waste from the Northeast Church Rock Mine in Gallup, New Mexico, which will clean up the mine that was operated by the United Nuclear Corp. between 1967 to 1982.

  • Intelligencer. Mooney, Jake // New York;4/18/2011, Vol. 44 Issue 12, p11 

    The article reports on the transport and planned use of the Putzmeister 70Z-meter truck-mounted concrete pump to hose down the Fukushima Daiichi reactor's spent fuel in Japan as of April 2011.

  • Fukushima Operator Routinely Overpays Contractors.  // Nuclear Waste News;1/16/2014, Vol. 34 Issue 1, p8 

    The article focuses on the economic aspects of a radioactive waste management operation handled by an electric utility firm Tokyo Electric Power Co. which has been operating at Japan's crippled Fukushima nuclear plant. It mentions that the company has been overpaying the contractors due to the...

  • Nuclear Waste: DOE's Environmental Management Initiatives Report Is Incomplete. Aloise, Gene // GAO Reports;6/2/2009, p1 

    The article presents a letter from the U.S. Government Accountability Office (GAO) addressed to the Congressional Committees. The letter notes on the incompleteness of the Department of Energy's (DOE) Environmental Management Initiatives Report on nuclear waste. It cites the five elements of the...

  • GAO: DOE Broke Law In Uranium Transfers To USEC. BEATTIE, JEFF // Energy Daily;9/27/2011, Issue 185, p1 

    The article reports on the conclusion of the U.S. Government Accountability Office (GAO) that the Energy Department (DOE) broke federal fiscal law when it used federally owned uranium to pay USEC Inc. for cleanup of Piketon site in Portsmouth, Ohio. Instead of depositing proceeds of the uranium...

  • Nuclear Waste: Better Performance Reporting Needed to Assess DOE's Ability to Achieve the Goals of the Accelerated Cleanup Program: GAO-05-764.  // GAO Reports;7/29/2005, p1 

    In February 2002, following years of rising costs to its nuclear waste cleanup program, the Department of Energy (DOE) announced a new initiative--the accelerated cleanup plan--and committed to reduce costs of cleanup by $50 billion, shorten the cleanup schedule by 35 years, and reduce risks to...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics