TITLE

Stalled time share project sees signs of life

AUTHOR(S)
ILLIA, TONY
PUB. DATE
April 2009
SOURCE
Las Vegas Business Press (10712186);4/6/2009, Vol. 26 Issue 14, pP13
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
The article reports on the possible resumption of the construction on the stalled Wyndham Desert Blue time share tower at West Twain Avenue at Dean Martin Drive in Las Vegas, Nevada. It states that the tower was half completed when work stopped. According to Brian Gordon, principal of Applied Analysis, a business advisory firm, the delays and cancellations which have taken place in the resort industry reflect the current financial and economic climate.
ACCESSION #
47881306

 

Related Articles

  • LV land values inch up. ILLIA, TONY // Las Vegas Business Press (10712186);11/23/2009, Vol. 26 Issue 47, pP15 

    The article reports on the increase in the prices of land in Southern Nevada in the third quarter of 2009. A report from Applied Analysis shows that the prices of property in Las Vegas Valley have increased at the end of September 2009. According to Brian Gordon, president of Applied Analysis,...

  • Distressed sales drive local land values down 74 percent in fourth quarter. ILLIA, TONY // Las Vegas Business Press (10712186);3/2/2009, Vol. 26 Issue 9, pP10 

    This article reports on the drop in land values in Las Vegas, Nevada during the fourth quarter of 2008, according to Applied Analysis. Factors that contributed to this trend include a deepening recession and the financial-market collapse. Particular focus is given to the average land values in...

  • Millennium Tower Rises with the Help of Subcontractors. Fitzgerald, Jay // Professional Contractor;Winter2015, p16 

    The article provides updates on the Millennium Tower Boston project in Boston, Massachusetts as of December 2015. Topics covered include thoughts from J.C. Cannistraro LLC President John Cannistraro on the project, challenges and unique features to the Millennium Tower project, and the reliance...

  • SABBAN TOWERS PODIUM LEVEL COMPLETE.  // Elevator World;Jul2008, Vol. 56 Issue 7, p50 

    The article announces the completion of the design of the podium level of its Sabban Towers project at The Pearl-Qatar by Sabban Property Investments (SPI) in Qatar. It states that the podium level encompasses all three towers of the development and will provide amenities, greenery and outdoor...

  • Galeries Unveils Foundation HQ.  // WWD: Women's Wear Daily;7/ 3/2014, Vol. 208 Issue 3, p6 

    The article discusses the Galeries Lafayette Foundation project in central Paris, France. Topics discussed include the transformation of its inner courtyard into a steel-and-glass exhibition tower while its shell will remain intact, its aims to function in collaborative and extremely convivial...

  • Nakheel increases height of Tall Tower to 1.4 kilometres. Foreman, Colin // MEED: Middle East Economic Digest;6/20/2008, Vol. 52 Issue 25, p10 

    The article reports on the move of Nakheel to finalize their plans on the Tall Tower project in the United Arab Emirates which involves increasing its height by about 1.4 kilometers-tall to make it the world's tallest skycraper. According to the article, the tower will house apartments, hotels...

  • East Midlands resignalling gets going.  // Modern Railways;Jul2007, Vol. 64 Issue 706, p22 

    The article reports that the East Midlands Resignalling Project worth £250 million is beginning work on its first phase in North Erewash in the summer of 2007. The region's 40-year old signalling systems will be replaced and renewed in a span of 5 years. Junctions along Trowell, Ironville and...

  • Dubai Marina tower tender to begin in June.  // MEED: Middle East Economic Digest;6/8/2007, Vol. 51 Issue 23, p23 

    The article reveals that tender documents are expected to be issued by the end of June 2007 for the main construction package on the Marina 101 tower project in Dubai Marina in the United Arab Emirates. The 101-storey structure will be 412 metres high with a total built-up area of 144,000 square...

  • Renewing the Building Envelope: A Multi-residential case study. Shedden, Brian G.; Genge, Gerald // Construction Canada;Apr2013, Vol. 55 Issue 3, p42 

    The article presents a case study on the high-rise tower renewal of York Condominium Corp. (YYC) 118 buildings. It says that the tower renewal seeks to re-invent the tower-in-a-park process that lead to their original construction by way of re-imagining things from energy and transit to the...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics