TITLE

Tom Stephens, Department of Transportation

PUB. DATE
March 2001
SOURCE
Bond Buyer;03/05/2001, Vol. 335 Issue 31089, p86
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Details the projects of the Nevada Department of Transportation. Supervision of the proceeds on roads and highways in the state; Sale of highway improvement revenue bonds; Focus on widening several highways.
ACCESSION #
4245598

 

Related Articles

  • New roads fall by wayside due to liquid asphalt price. Illia, Tony // Las Vegas Business Press (10712186);2/27/2006, Vol. 23 Issue 9, p10 

    Reports on a decline in new roads construction in Las Vegas, Nevada due to the increase of liquid asphalt prices. Cancellation of some jobs by the Nevada Department of Transportation due to the growing construction cost; Approval of a $1 billion statewide road and highways construction bond...

  • Road to Pahrump gets easier. Illia, Tony // Las Vegas Business Press;6/3/2002, Vol. 19 Issue 22, p3 

    Reports the widening of the transportation corridors in Las Vegas, Nevada. Contribution of Las Vegas Paving Corp. in doing the upgrades and improvements; Addition of a turn lane on the route to Shoshone and Death Valley; Statistics from the state Department of Transportation on the number of...

  • State awards first highway design-build project.  // Las Vegas Business Press (10712186);7/30/2007, Vol. 24 Issue 31, Special section p8 

    The article reports on the $242 million design-build project awarded by the Nevada Department of Transportation to North Corridor Constructors. The project calls for a widening of a 5.5-mile section of Interstate-15 from the Spaghetti Bowl north to Craig Road. It also add Intelligent...

  • NDOT readies for first design-build highway project. Illia, Tony // Las Vegas Business Press (10712186);5/7/2007, Vol. 24 Issue 19, p8 

    The article reports that Nevada's Department of Transportation (NDOT) is pursuing its first design-build project. The agency's project calls for expanding a 5.5-mile section of interstate between the Spaghetti Bowl and Craig Road in North Las Vegas. Design-build has long been used in neighboring...

  • Roadwork lies ahead for LV-L.A. interstate drivers. Hare, David // Las Vegas Business Press;10/23/2000, Vol. 17 Issue 42, p8 

    Reports on planned road widening projects in Interstate 15 in each direction from the Nevada/California state line to Interstate 215. Total estimated construction costs; Benefits of the road improvements; Teamwork of the Nevada Department of Transportation and the California Department of...

  • New Blue Diamond interchange moves forward.  // Business Press: Serving Southern Nevada;1/24/2005, Vol. 22 Issue 4, Special section p11 

    Presents information on the planned construction of the Blue Diamond Road interchange at Interstate 15 in the U.S. in January 2005. Remarks from John Bradshaw, engineer from the Nevada Department of Transportation (NDOT), on the project; Information on the widening project of NDOT for the Blue...

  • Nevada Tackles Design-Build To Ease Congestion Crunch. Illia, Tony // ENR: Engineering News-Record;5/14/2007, Vol. 258 Issue 18, p16 

    The article reports on the widening of the Interstate 15 in Southern Nevada. The interstate expansion is the first construction project of the state Department of Transportation after several years. Details of the project are mentioned. The contractors vying for the project are mentioned,...

  • Nevada Drops P3 Plans on $740M Highway Project. Webster, Keeley // Bond Buyer;8/26/2014, Vol. 1 Issue 34167, p1 

    The article focuses on the plan of the Nevada Transportation Board to manage the highway widening project Neon itself by issuing municipal bonds rather than using a public-private partnership. It mentions that the project will include improvements to the Interstate-15 that bisects Las Vegas,...

  • Galena Bridge Deal Delay? Cohen, Jackie // Bond Buyer;5/26/2006, Vol. 356 Issue 32390, p39 

    The article reports that Nevada Department of Transportation (DOT) has temporarily postponed a $200 million bond sale. The sale was originally planned for September because of the need to find another construction firm to finish the Galena Creek' Bridge in the northern part of the state. The DOT...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics