TITLE

PLANNING ORDER RELEASE DATES FOR MULTILEVEL LINEAR SUPPLY CHAIN WITH RANDOM LEAD TIMES

AUTHOR(S)
HNAIEN, FAICEL; DOLGUI, ALEXANDRE; MARIAN, HÉLÈNE; LOULY, MOHAMED-ALY
PUB. DATE
March 2007
SOURCE
Systems Science;2007, Vol. 33 Issue 1, p19
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
A multilevel linear supply chain is considered in this paper. The lead times at each level are random discrete variables, and the finished product demand is fixed and known. The objective is to minimize the sum of holding and backlogging costs for the finished product. We propose a novel mathematical model which gives the optimal order release dates for the components. From a theoretical point of view, this formulation is equivalent to the discrete Newsboy model. Numerical tests are reported.
ACCESSION #
37837485

 

Related Articles

  • Optimal inventory policy involving back-order discounts and variable lead time demand. Wen-Chuan Lee; Jong-Wuu Wu; Chia-Ling Lei // International Journal of Advanced Manufacturing Technology;Oct2007, Vol. 34 Issue 9/10, p958 

    This paper allows the backorder rate as a control variable to widen applications of the Wu and Tsai’s model. Moreover, we also consider the backorder rate that proposed by combining the work of Ouyang and Chuang (also see Lee ) with the work of Pan and Hsiao , ) (also see Pan et al. ) to...

  • Optimization of Reorder Point Strategy of Assembly Manufacturer with Random Variables. Shuangyan Li; Dezhi Zhang; Fangping Jin // International Journal of Business & Management;Mar2013, Vol. 8 Issue 5, p89 

    For assembly system, randomness and variableness make it impossible to control the inventory accurately specially. Because the negative effect of them have ripple effects. So we investigate reorder point optimization strategy of assembly manufacturing system with random demand and random lead...

  • Meinberg.  // GPS World;Jun2019, Vol. 30 Issue 6, p55 

    No abstract available.

  • Flex Time. KOOP, NICK // Printed Circuit Design & Fab: Circuits Assembly;Jan2016, Vol. 33 Issue 1, p17 

    The article provides an answer to a question on the long lead time of a 12-layer rigid-flex printed circuit board (PCB).

  • Digital Machine Shop: How Automation Cuts Manufacturing Lead Time. Paradise, Vynce // Modern Machine Shop;Jun2019, Vol. 91 Issue 13, p99 

    The article offers information on the webinar "Digital Machine Shop: How Automation Cuts Manufacturing Lead Time" to be held on June 20, 2019, presented by Siemens.

  • Getting Comp Sets Right for the Digital Market. Green, Cindy Estis // Hospitality Upgrade;Summer2019, p126 

    No abstract available.

  • Convection‐permitting ensembles: Challenges related to their design and use. Frogner, Inger‐Lise; Singleton, Andrew T.; Køltzow, Morten Ø.; Andrae, Ulf // Quarterly Journal of the Royal Meteorological Society;Sep2019 Supplement S1, Vol. 145, p90 

    Challenges related to the design and use of a convection‐permitting ensemble (CPEPS) are discussed. In particular the scale‐dependent predictability of precipitation and the use of a CPEPS as well as its potential added value over global ensemble prediction systems (EPS) are...

  • Engineering business salvation. Hughes, Michael // Industrial Engineer: IE;Nov2013, Vol. 45 Issue 11, p6 

    An introduction to an article about a manufacturer that decreased its lead-times to speed up its supply chain in order to meet demand and improve its profitability is presented.

  • Fast and furious. STANLEY, LYNN // FFJournal;Nov2015, Vol. 12 Issue 9, p40 

    The article focuses on how Cincinnati, Ohio-based Diehl Steel is helping manufacturers handle demand through short lead times and shorter delivery schedules.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics