TITLE

Prolamsa 'Opens First Facility in United States

PUB. DATE
March 2009
SOURCE
Metal Center News;Mar2009, Vol. 49 Issue 3, p40
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports that Prolamsa USA has begun operating its new manufacturing facility in Laredo, Texas. It states that the facility is expected to produce mechanical tubing from 0.5 to 2.5 inches. A second facility will stock metal building shapes and components. General manager Jean-Marie Diedrichs says the facilities will enable to company to provide faster deliveries on its customers.
ACCESSION #
37375599

 

Related Articles

  • Satisfied customers keep coming back. Duensing, Lauren // Modern Metals;Apr2012, Vol. 68 Issue 4, p88 

    The article discusses how Prolamsa USA acted upon the results of the survey conducted on its customers for the determination of the customer's perception of the company's overall performance. Jean-Marie Diederichs, commercial director of U.S. operations explains that in response to the need for...

  • Production to begin at Alam rebar plant.  // MEED: Middle East Economic Digest;6/15/2007, Vol. 51 Issue 24, p23 

    This article reports the preparation of Alam Steel Industries to begin production at one of the largest plants in the world for cutting and bending steel products. The facility in Dubai Investments Park in United Arab Emirates will cover an area of 25,000 square metres and will open on June 21,...

  • Muslims, steel plant reach million-dollar settlement.  // National Catholic Reporter;4/11/2003, Vol. 39 Issue 23, p10 

    Reports that the U.S. Equal Employment Opportunity Commission has announced a settlement deal for Muslim employees who claimed they were harassed for their religious beliefs while working at a steel plant. Details of the case; Legal precedents; Implications on religion and employment.

  • Nucor Selects Utah City for Building Systems Plant.  // Metal Center News;Oct2006, Vol. 46 Issue 11, p62 

    The article reports on the selection of Brigham City in Utah as the location for the new facility of Nucor Corp. The said facility will produce metal building systems and components. The facility will have an annual capacity of 45,000 tons and will cost $27 million to construct. Hamilton Lott...

  • U.K. Port Aims to Stay Busy. McGeer, Bonnie // Asset Securitization Report;9/20/2004, Vol. 4 Issue 36, p18 

    Reports on the plan of steel manufacturer and a major customer of PD Portco PLC, Corus PLC, to sell its plant in Teesside, England. Potential buyers of the plant; Intention of the company to close the plant; Significance of the sale in eliminating uncertainty over how the plant closure would...

  • Tighter tolerances in demand.  // Metal Center News;Jun99, Vol. 39 Issue 7, p59 

    Reports on the installation of high-tech 52-inch Sendzimer mill at the facility of the Precision Specialty Metal Inc. in Los Angeles, California. Efforts to increase production capability; Production of light-gauge stainless steel and high-performance alloys; Utilization of continuous strand...

  • Introducing an Argon Bottom Blow Technology for Use in Steel Ladles at the Magnitogorsk Iron and Steel Works Joint-Stock Co. Ovsyannikov, V. G.; Bodyaev, Yu. A.; Andreev, V. P. // Refractories & Industrial Ceramics;Jul/Aug2004, Vol. 45 Issue 4, p279 

    Provides information on the technology installed in the factory of Magnitogorsk Iron and Steel Works Joint-Stock Co (MISW JSC). in Magnitogorsk, Russia. Concept of the bottom blow technology; Details of the blowing units supplied to MISW; Classification of tuyeres.

  • Factories and farms. Lane, Kathryn // Germany: The Land;2001, p24 

    This article presents an overview of German industries. Germany is a huge industrial power. It manufactures household goods, from appliances to stereos, that are sold around the world. The computer industry is also very important to the country's economy. In the late 1800s, Germany was one of...

  • Timken to Increase Heat-Treating Capacity.  // Metal Producing & Processing;Jul/Aug2006, Vol. 44 Issue 4, p6 

    The article reports on the plan of Timken Co. to add an induction-heating line at its Faircrest Plant in Canton, Ohio to increase the facility's heat-treating capability for bar and tubular products. The upgrading project is estimated to cost about $5 million. The installation is scheduled for...

Share

Read the Article

Courtesy of VIRGINIA BEACH PUBLIC LIBRARY AND SYSTEM

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics