TITLE

Carolina Panthers' HD control-room rebuild maximizes communication

PUB. DATE
December 2008
SOURCE
Broadcast Engineering;Dec2008 Digital Reference Guide, Vol. 50 Issue 12, p74
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the plan of Carolina Panthers to rebuild its entire control room to make it high-definition (HD) compliant and add new equipment in the facility in the U.S. According to the article, a new climate-controlled engineering space was created to maximize the layout for new sophisticated tools that will be put in the area. In addition, it states that every details were being carefully managed to ensure the customization of all production needs.
ACCESSION #
35979870

 

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics