TITLE

Sletten completes new UNLV Science, Engineering building

PUB. DATE
November 2008
SOURCE
Las Vegas Business Press (10712186);11/3/2008, Vol. 25 Issue 44, Special section p8
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
The article reports that Sletten Construction of Nevada completed the construction of the New Science, Engineering and Technology building at the University of Nevada in Las Vegas, Nevada. The building is located at northern edge of campus, adjacent to the Thomas Beam Engineering Building. Several facilities of the building include clasrooms, auditorium and laboratories for nanotechnology, civil engineering, soils, among others.
ACCESSION #
35217241

 

Related Articles

  • Sletten builds UNLV Dental School.  // Las Vegas Business Press (10712186);2/29/2007, Vol. 24 Issue 5, Special section p18 

    This article reports on the ongoing construction of the Advanced Dental Education building of the University of Las Vegas, Nevada. The design-build contractor for the project is Sletten Construction. The total budget for this project was $16.4 million, and it is scheduled to be finished by July...

  • UNLV on a building binge. Ward // Las Vegas Business Press;11/22/99, Vol. 16 Issue 46, p1 

    Focuses on the building boom being experienced by the University of Nevada in Las Vegas in 1999. Number of facilities added; Factors driving the building boom; Roundup of projects underway.

  • THE TUSCANY COLLECTION SUPPLIES SANDSTONE FOR UNLV PROJECT.  // Stone World;Jan2010, Vol. 27 Issue 1, p26 

    The article highlights the sandstone exterior of Greenspun Hall of the University of Nevada, Las Vegas, where its beige and red sandstone was supplied by the Tuscany Collection in Las Vegas, Nevada.

  • New Urban Affairs building set for UNLV campus. Knightly, Arnold M. // Las Vegas Business Press (10712186);7/24/2006, Vol. 23 Issue 30, p11 

    The article reports on the construction of a Greenspun College of Urban Affairs building on the University of Las Vegas campus in Nevada. The building will house the college's departments. Robert A. M. Stern Architects of New York City was selected to design the building project. Funding for the...

  • UNLV plans lead role in solving area's problems. Miller, Valerie // Las Vegas Business Press (10712186);10/29/2007, Vol. 24 Issue 44, p3 

    The article focuses on the plan of the University of Nevada, Las Vegas, to take a lead in green building in Southern Nevada. The newly unveiled Urban Sustainability Initiative makes the university a likely incubator to solve Southern Nevada's growth-induced water, air and energy problems. This...

  • Sletten builds the new Northwest Career & Technical Center.  // Las Vegas Business Press (10712186);4/24/2006, Vol. 23 Issue 17, Special section p11 

    Reports on the construction of the Northwest Career and Technical Center by Sletten Construction of Nevada Inc. at Durango Drive and Tropical Parkway in Las Vegas in 2006. Cost of the project; Significance of the facility; Certification to be sought by the building from the U.S. Green Building...

  • Seismic Performance of Reinforced Concrete Bridge Bents. Moustafa, Khaled F.; Sanders, David; Saiidi, M. Saiid; El-Azazy, Saad // ACI Structural Journal;Jan/Feb2011, Vol. 108 Issue 1, p23 

    This study examined the dynamic behavior of two-column bents used to support box-girder bridges. Three 0.3-scale specimens were subjected to earthquake records from the 1994 Northridge Earthquake using a large shake table (4.3 x 4.4 m [14 ft × 14 ft 6 in.] in plan) at the University of...

  • McCarthy uprades UNLV Shadow Lane Campus.  // Las Vegas Business Press (10712186);8/27/2007, Vol. 24 Issue 35, Special section p18 

    The article reports on the renovation of the University of Nevada, Las Vegas' Shadow Lane Campus at Charleston Boulevard and Shadow Lane conducted by McCarthy Building Cos. The upgrade added 15,000-sq-ft classroom, a lab and administrative office space for the nursing and dental schools. The...

  • McCarthy finishes UNLV biomedical center.  // Las Vegas Business Press (10712186);3/2/2009, Vol. 26 Issue 9, p7 

    This article focuses on the involvement of McCarthy Building Companies in the construction of a biomedical facility at the University of Nevada's Shadow Lane Campus in Las Vegas. The biomedical facility project is worth $7.5 million. SmithGroup Inc. is a Phoenix, Arizona company responsible for...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics