TITLE

CORRECTION

PUB. DATE
September 2008
SOURCE
Hill;9/23/2008, Vol. 15 Issue 109, p3
SOURCE TYPE
Newspaper
DOC. TYPE
Article
ABSTRACT
A correction to the article regarding the incorrect information that appeared during the legislation concerning the drilling of the Arctic National Wildlife Refuge (ANWR).
ACCESSION #
34967158

Tags: ERRATA;  DRILLING platforms

 

Related Articles

  • Correction.  // Technology Teacher;Feb2009, Vol. 68 Issue 5, p20 

    The article presents corrections to the article "Offshore Oil Drilling: Buying Energy Independence or Buying Time?" by Steven Baird in the November 2008 issue and "Snake Oil: Debunking Three Truths," in the November 22, 2008 issue.

  • Clarification.  // National Underwriter / P&C;7/25/2005, Vol. 109 Issue 28, p25 

    Provides corrections to an article that appeared in the July 18 edition about comments made by Bruce Jefferis, managing director of Aon National Resources in Houston on the loss of an oil platform which was self-insured by BP and partners.

  • More drilling rigs in Alabama? Brownlee, John // Salt Water Sportsman;Oct96, Vol. 57 Issue 10, p27 

    Reports on the increasing number of offshore oil and gas drilling platforms in Alabama. Trend as a precursor to the permission of drilling operations in the state's gulf region by 2001; Protests of drilling operations from Florida.

  • Statistics show platform removal boom forthcoming. Crowden, Michael // Offshore;Jan95, Vol. 55 Issue 1, p14 

    Reports on the possible increase in oil drilling platform removal activity in the United States in 1996. Creation of a backlog platform removal due to faster depletion of oil reserves; Statistics regarding offshore structures in the Gulf of Mexico.

  • Deep draft hulls key to production in ultra-deepwater. LeBlanc, Leonard // Offshore;Aug95, Vol. 55 Issue 8, p26 

    Describes various drilling platform designs. Includes raft tension-leg platform; Rigid riser semi; Spar platform.

  • Orynx, others elect to extend production on aging North Sea platform.  // Offshore;Aug95, Vol. 55 Issue 8, p52 

    Reports on the extension of oil production on aging platforms in the North Sea. British Petroleum Co.'s cost control exercise for its oil fields; Conoco's agreement with Orynx UK Energy Co.; Inter-related studies on the Murchison platform facilities.

  • North Sea platform tank cleanup major cost for operators. LeBlanc, Leonard // Offshore;Sep95, Vol. 55 Issue 9, p18 

    Features considerations in the cleanup of platform tanks in the North Sea. Option to sink the tanks due to high onshore disposal costs; Need to free the tanks of hydrocarbon products for offshore disposal; Growing acceptance of the sinking of space frame jackets in the Gulf of Mexico.

  • Shell signature strengthens Malaysia's LNG supply profile.  // Offshore;Nov95, Vol. 55 Issue 11, p42 

    Looks at a possibility of five new platforms which could be installed in two blocks off Sarawak, following a preliminary agreement over gas supplies to the Malaysian Tiga project. Field candidates; Other information on fields.

  • Contractor incentives, drilling review trim 27% off Britannia... Beckman, Jeremy // Offshore;Nov95, Vol. 55 Issue 11, p46 

    Looks at plans for Britain's largest new gas/condensate field development possibly ending up under the targeted figure cost. Approval from the United Kingdom Department of Trade and Industry; Information on pre-drilling process.

Share

Read the Article

Courtesy of your local library

Public Libraries Near You (See All)
Looking for a Different Library?

Other Topics